Weekly summary and plan for the next week :

Freon for RPC community - problem in gas barrack. Ventilation failed, in combination with low level the pressure could not be stable.

sTGC  - problem with CO2 interlock. top of gas rack. (to be typed)

Problems with DIP values - linked to announced interventions by BE-CO and restarting of server infrastructure.

sTGC request : alarm on CO2 flow, we check with EP-DT-DI

 ------------------

ALICE arrived with 8 chambers, 2 in irradiation, 6 in corridor.
Friday, Saturday, Monday  :   8h30 Measurement with att. 1 then 1h access (9h30-10h30)
Tuesday : 8h30-9h30 att.1 for 1h, otherwise 2.2 in upstream field 
                (this week in the afternoon due to ATL-MM 13h-15h)
Will continue until Mid-February.

sTGC with one test chamber - 1 month test, running
    2 chambers QS2 production chamber in upstream position
    next week the 2 will be removed again

ATLAS-MM :   Today chamber arrives in preparation zone.
                          If fine, chamber enters on Monday 9h-10h
                          Tues 4 h scan : 5 filters 50->1, followed by short access

CMS-RPC : installation of electronics for EcoGas, installation of 2 chambers on last Wednesday.
                    Currently using the default gas mixture.


CMS-RPC trolly 1&3


EP-DT2  & CMS-RPC :

       for the next days - repeatedly : 2h measurement with att. 100, then 2h no measurement (until 18 h)
        will continue with different att factors for the next 2 weeks.
 

LHCb + CMS-CSC small prototype.

CMS-GEM 1&2


EP-DT1

ATLAS-RPC - 2 setups, IMPACT missing   -
next 6 weeks :  Wednesday 3 short accesses with after Source ON within 3h - after access day.


CMS-DT MB 1&2 - to stop on 30.01 with 1/15 irradiation.  will be OFF afterwards.
          

CMS-CSC + LHCb  (IMPACT for LHCb missing)
          Waiting for end of CMS-DT.
          move MiniCSC back to downstream next Wednesday.

Pb blocks stored on the outside.

 

Today filter scan : Upstream 100

                              Downstream CMS-DT