Weekly summary and plan for the next week :
Problems with DIP values - SOLVED for the moment.
sTGC request : alarm on CO2 flow - DONE
------------------------
ALICE arrived with 3 x 2 chambers,
Friday, Saturday, Monday : 8h30 Measurement with att. 1 then 1h access (9h30-10h30)
Tuesday : 8h30-9h30 att.1 for 1h, otherwise 2.2 in upstream field (not needed this week)
(this week in the afternoon due to ATL-MM 13h-15h)
Will continue until Mid-February.
sTGC with one electronic test chamber - 1 month test, running
3 x 4h filter scan (range 100-1) upstream Today after ATLAS-MM / Sunday afternoon / Tuesday afternoon
sTGC Productiuon : 2 chambers QS2 production chamber in upstream position to be remmoved
return beginning of March
ATLAS-MM : MM SM2 detector in the bunker since today Wednesday
upstream scan at 9:30AM [Thursday].
==> 20 min at each filter and in between a 46000 attenuation [333] for 5 minutes
50 / 20 / 10 / 6.9 / 4.6 / 2.1 / 1.5 - should be finished @2pm latest.
access after scan to move chamber.
CMS-RPC : installation of electronics for EcoGas, installation of 3 chambers in Trolley 3.
Currently using the default gas mixture for 1-2 weeks.
CMS-RPC trolly 1&3
EP-DT2 & CMS-RPC :
for the next days - repeatedly : 2h measurement with att. 100, then 2h no measurement (until 18 h)
will continue with different att factors for the next 2 weeks.
LHCb +
CMS-CSC small prototype will move in 1-2 weeks back to downstream
CMS-GEM 1&2
EP-DT1
ATLAS-RPC - 2 setups, IMPACT now available.
next 6 weeks : Wednesday 3 short accesses with after Source ON within 3h - after access day.
CMS-DT MB 1&2 - to stopped on 30.01 with 1/15 irradiation.
3 h filter scan downstream (15 to higher) - to be checked with upstream stable filter scans.
CMS-CSC + LHCb : starting next week regular Thursday filter scans downstream 6.9, typically 10-18h.
EN-CV and ATLAS-NSW samples installed on CMS-GEM (passive irradiation)
We will check for shadowing next week.