Weekly summary and plan for the next week :
------------------------
ALICE : 2 big (arriving at end of February) , and 5 small ones to be tested (arriving next)
This week : 7 big ones, 1 small one.
Friday, Saturday, Monday: 8h30 Measurement with att. 1 then 1h access (9h30-10h30)
Tuesday : 8h30-9h30 att.1 for 1h, otherwise 2.2 in upstream field (not needed this week)
Will continue until end of February.
ATLAS-MM : SM2 out, back on Monday morning (during ALICE access)
upstream scan after ALICE (short access around 10h) Tuesday 50-4.6 for 3h.
SM1 (module8)
==> source scan this afternoon : 100-4.6 for 8h
if fine, chamber can go out tomorrow
sTGC with one electronic test chamber - 1 month test, running
2h filter scan (range 2.2-1) upstream Friday and Monday (at 15h)
sTGC Productiuon : return beginning of March
CMS-RPC : installation of electronics for EcoGas, installation of 3 chambers in Trolley 3.
Currently using the default gas mixture for 1-2 weeks.
CMS-RPC trolly 1&3 : Starting next Wednesday 5 night campain, stable condition 6.9 stable.
EP-DT2 : Today filter scan until 12h30, Tomorrow 10h-16, factor 100
Mo : 3h with absorption 100 after lunch.
CMS-RPC :
for the next days - repeatedly : 2h measurement with att. 100, then 2h no measurement (until 18 h)
will continue with different att factors for the next 2 weeks.
LHCb +
CMS-CSC small prototype will move in 1-2 weeks back to downstream
CMS-GEM 1&2
EP-DT1 : Next Thursday downstream 8h-12h full filter range downstream
ATLAS-RPC - 2 setups, IMPACT now available.
Tomorrow : after EP-DT (16h) 2h scans with multiple source off.
Wednesday : after access 2h with multiple stops again.
CMS-DT MB 1&2 - to stopped on 30.01 with 1/15 irradiation.
CMS-CSC + LHCb : using GC tomorrow full day.
EN-CV and ATLAS-NSW samples installed on CMS-GEM (passive irradiation)
We will check for shadowing next week.