Weekly summary and plan for the next week :
------------------------
ALICE : 2 big (arriving at end of February) , and 5 small ones to be tested (arriving next)
This week : 4 big ones, 3 small one. Friday, Saturday 8h30 Measurement with att. 1 then 1h access (9h30-10h30) Monday: access only (9h30-10h30) Tuesday : 8h30-9h30 att.1 for 1h Will continue until end of February.
ATLAS-MM : SM2 out - test is over. SM1 (module7) to be install on Monday morning (during ALICE access) near the barrier (outside the cone) for gas flushing and to be tested on Tuesday after Alice Test.
sTGC with one electronic test chamber - 1 month test, running
2h filter scan (range 2.2-1) upstream Friday and Monday (at 15h)
sTGC Productiuon : return beginning of March
CMS-RPC : EcoGas - 5h of source OFF measurements on WED access
CMS-RPC trolley 1&3 : Wednesday 13th measurements started for 5 night campaign, stable condition 6.9 stable. 4.6 att. only for 5 min during the whole test
EP-DT2 : no more source scan needed. Measurements will continue with the GC.
LHCb + setup from upstream removed completely.
CMS-CSC small prototype moved back to downstream in the CMS-CSC trolley
CMS-GEM 1&2
EP-DT1 : need some access (30 min) after the meeting to check some issue with Ar supply
ATLAS-RPC - 2 setups, IMPACT now available.
Today THU 14th : after EP-DT (1.30 pm) 2h scans with multiple source off and stops. To be done before 5pm
CMS-DT MB 1&2
CMS-CSC: using GC
EN-CV and ATLAS-NSW samples installed on CMS-GEM (passive irradiation)
EN-CV samples removed on Monday 11th instead ATL-NSW samples still in. To be remove next week.