GIF++ installation and schedule meeting
-
-
09:15
→
09:35
Review of last week operation & plans for this week 20m
User Reports / Overview :
----------------------------------
ATLAS - sTGC : : 2 chambers (QS1+QS2 )to be placed on Friday, swapped on Monday (2 QS2).ATLAS-MM : Yesterday - rerouting of cables, moving to downstream area.
SM9 and SM12 in bunker, on universal trolley. Will stay for 2 weeks.
EP-DT1: Fine. Radiating.EP-DT2 : 3h Monday and Tuesday afternoon, short access before/after. filter 22-10
EcoGas : HFO bottles finished, new one ion order.
Signal cable to be installed during one of the next access or directly during Wednesday access.CMS-RPC : Trolley for testing the electronics is installed. Cosmics with background. ISEC visit done.
1 week program. 22-2.2 for 6h each.
For the other trolleys 2.2 requested.
Gas flow needs to be checked, as we are on the limit.CMS-GEM 1&2 : GEM 2 gas flow seems to be ok now. GEM 1: OFF
ATLAS-RPC : BIS trolley downstream in front of R&D setup.
No request for the R&D setup.CMS-DT MB 1&2 : Outside - Chambers fully re-cabled and re-connected to the gas lines
LHCb : New position checked and no complaining so far.
CMS-CSC: Resumed irradiation after few problems with gas and HV.
Some irradiation time with absorption 10 requested for 4-6h.==========================================================
Weekly Planning : UPSTREAM
Default filter settings : 2.2
Thursday (today): CMS-RPC 1h source OFF after the meeting then scan 4h-5h 22-2.2
Eco gas: source scan for 3h -> 1h each ABS (4.6, 10, 46) starting after lunch till 5pmFriday : CMS-RPC 5h scan starting at 10h.
ATLAS-sTGC (morning) 1h filter1, then Access at 9h (โ1h)Saturday : CMS-RPC runs with different absorbtion filters.
Sunday : CMS-RPC runns with different absorbtion filters.
Monday : ATLAS-sTGC (morning) 1h filter1, then Access at 9h (โ1h)
EP-DT2 3h afterwards short access before/after. filter 22
combined with CMS-RPC.
Tuesday : ATLAS-sTGC (morning) 1h filter1, then Access at 9h (โ1h)
EP-DT2 3h afterwards short access before/after. filter 10
combined with CMS-RPC.Wednesday :
-------------------------------------------------------------------------------------------------------
Weekly Planning : DOWNSTREAM
Default filter settings : 1
Thursday (today) :
Friday :
Saturday :
Sunday :
Monday : CMS-CSC : Absorption 10 requested for 4-6h starting at 10h, then back to 1
Tuesday : CMS-CSC : Absorption 10 requested for 4-6h starting at 10h
ATLAS-MM 2h scan 6.9-1 started at 8 am -10h
ATLAS-RPC 1h source scan (ABS 100 to 1)Wednesday:
-------------------------------------------------------------------------------------------------------
-
09:35
→
09:40
Long Term Planing - General Items 5m
Irradiator Maintenance : Week 29
---------------------------------------------------------
Gas usage at GIF : we need to compile a table of gas mixture / consumption
Gas training courses : ATEX level 1 and F-Gas training courses.
List of trained people to be collected.
https://lms.cern.ch/ekp/servlet/UNIVERSALSEARCH?ACTION=SEARCH&KEYW=atex
---------------------------------------------------------
Next Annual User Meeting : First half of SEPTEMBER 2019
Please let us know if there are particular bad days (ATLAS/CMS weeks etc) - 09:40 → 09:50
-
09:50
→
10:00
Infrastructure & Upgrades to the Facility 10m
Improvements needed or planned for the facility.
Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)New Items :
==========Cleaning of DCS and installation of UPS : to be scheduled.
Ongoing Projects :
=============Correction of Irradiator Signals after power cut.
Since installation of UPS, the Irradiator signals UNSAFE after a power cut, independently if the source was ON or OFF at the time. In reality, source will always be in safe position after power cut. Power cycle controls in control room to get correct status.PyTIMBER :
Additional values need to be collected/republished ?
- REMUS - to be included in GIF Display
- XTDV - to be included in pytimber only-
Bunker Extension Project 10m
News about the ongoing bunker extension
-
Cosmic Trigger 10m
-
10:00
→
10:30
Announcements 30m
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics-
IMPACTS for 2019 5m
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
- two chambers on individual supports -> 2 IMPACT declarations
- multiple chambers swapped on same or similar support -> one IMPACT declaration
- basically, if you need two locations, please make two IMPACT declaration (clone)
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).NEW IMPACT needed for 2019 !
-
AOB 5m
Issue with ligth. Button near access door should enable the light for additional 2h.
We plan to keep the light over the GIF area active in the near future (change by EN-EL needed) -> NOT FEASABLELocked door on Saleve side.
Proposal top remove the cylinder to avoid the guard locking the door during night times. -> Cylinder HAS BEEN REMOVED
-
-