Gas systems project

→ Europe/Zurich
155/R-047 (CERN)

155/R-047

CERN

10
Show room on map
Beatrice Mandelli (CERN), Frederic Merlet (CERN)

GAS M&O meeting 1 July 2019

Present: Beatrice, Andrea, Kacper, Roberto, Michal, Gianluca, Mara

Indico: https://indico.cern.ch/event/831298/

 

ALICE #no elog

 

ATLAS #1868

  • ATLAS TGC
    • Discussion about TGC flowcell status by Michal: https://indico.cern.ch/event/831298/contributions/3481980/attachments/1871550/3079937/ATLAS_TGC_Canbus_diagnostic.pdf
    • Motherboard changed in rack 62 and 63: now the reading input/output is correct
    • Problem in flowcell #1 is fixed by changing the ELMB: it looks like it appeared after a power-cut
    • Next steps (in this order):
      • Change 18 V power supply —> Kacper
      • Change motherboard and ELMB in another rack —> Michal/Kacper
      • Check with Patrick if there could be an electrical problem —> Beatrice/MIchal
      • Wait few months and monitoring the situation —> Mara
  • TRT
    • Maintenance of safety valves this week

 

CMS #1861

  • DT
    • New pneumatic pipes installed as well as new rack
    • Exhaust zimmerli modification doesn’t work
  • RPC
    • OFF
    • Qualification of buffer volume
    • RE+3 will be installed this week and next Monday it will be RE+4
    • Modification of piping for injection mixture from purge in pre-distribution —> to do
  • GEM
  • OTHER
    • Last week there was not power and this caused a delay in the software testing for DT
    • Changed power supplies for CSC, DT, RPC
    • Andrea removed safety valves in the supply of the mixer for CSC, DT, RPC

 

LHCb #1865

  • RICH1
    • in Run with CO2
    • to monitor the Air content with the Analysis Chain (O2) and with GC for N2 (every two weeks) —> Mara
  • RICH2
  • OT
    • SG racks can be sent in Meyrin

Reminder:

  • MWPC in run with Ar/CO2
    • Rack 64 —> to investigate 

 

PIQUET

  • Nothing to report

 

GENERAL

  • Profibus card
  • MFC PID
    • To find a way to check the PID of the MFC
    • This week: dismount the high flow MFC and check PID —> Kacper
  • Standard maintenance
    • Prepare a list for the maintenance —> Beatrice

 

PLC/Software

  • Discussion on DT PLC replacement
  • General: do not re-start a system if all fundamental tests have not been done (I/O check, interlock tests, etc)
There are minutes attached to this event. Show them.