Status of installation activities and next steps.
Plans for commissioning.
Test procedures.
Exchange of information between plant and detector.
Input required to finalize the P&ID.
Flow rates and Δp across the detector.
ΔT(CO2 - silicon).
Temperature sensors.
Installation and commissioning schedule.
Potential contamination from Ti pipes.
Flow rates and Δp across the detector.