GAS M&O meeting 28 October 2019

Present: Beatrice, Roberto, Michal, Fred, Patrick, Kacper, Andrea, LPh, Mara, Gianluca, Sabino, Federico, Fabio

Indico: https://indico.cern.ch/event/859067/

 

ALICE #no elog

  • MTR

Reminder:

    • Dummy chamber: Arturo will install the pipes in January, gas team will do weld
    • exhaust pressure regulation does not work
    • mixer pressure regulation does not work: Zimmerli not installed
  • TPC

Reminder:

    • LPh to prepare a summary on how the system is now —> this week
  • TRD
    • Rack 66 in error and not selected —> LPh to check

Reminder

    • Purifier: to review if keep the safety valve or the rupture disk
    • Purifier: safety valve at the input where we have Ar or Ar/H2 at high pressure —> LPh to check with safety

 

ATLAS #2036

  • CSC

Reminder:

    • After the power-cut there was not communication with PLC: damage of differential circuit breaker —> to repair
  • MDT

Reminder:

    • Rack 68 (ch 17): one channel is keeping going to zero —> try to change the ELMB
  • General
    • Power-cut due to smoke alarm in SGX1 due to external work
  • RPC
    • Andrei is finishing the pipes
    • This week to send everything to cleaning

 

CMS #2034

  • RPC
    • OFF
    • Anton asked to prepare all dummy chambers
    • Rack 85: problem of pressure sensors in error: problem in the cable (UX-US) —> contacted Anton to change it
    • Feedback valve in exhaust to check —> Patrick: the N2 was closed
    • Commissioning of the software on-going
    • To add filter for pump
  • DT

Reminder:

    • Test for power cut and re-start for the exhaust line —> to do other tests
  • CSC

Reminder:

    • Warning to set-up —> Beatrice/Michal/Roberto
  • GEM
    • Commissioning started: elog 2017
    • Start planned for 4th November: connection of 12 channels GE1/1- from tomorrow

Reminder:

    • To modify the réseaux socket for the GEMPLC (now it is with TOTEM) —> Andrea
    • Control rack: to modify power supply and electrical cable (still with TOTEM) —> Patrick/Michal
    • 1 chamber in purge in CO2
  • R134a recuperation
    • Added line of Air for the R134a recuperation
    • Add line for iC4H10 exhaust this week —> on-going
    • To check for supply of 220 V + 400 V (Lauda) —> Patrick
    • To understand logic in case of presence of leak/iC4H10 —> Roberto/Nicola Broca

 

LHCb #2035

  • RICH1
    • in Run with CO2
  • RICH2
    • need to instal filter but it will arrive mid November: to look for another place before the filter of the exhaust
  • GC
    • PC is working but not the GC —> today company will come to check
  • SciFi
    • Start electrical work
    • Need to stop all system to modify N2 line —> this week

 

PIQUET

  • elog  886
    • Alarm for HH temperature in cloud
  • elog 885
    • ALICE TRD too long injection time: Andrea changed the mixer flow injection to 5h but he said that alarm was still active
    • LPh to verify why we inject for such a long time

 

GENERAL

  • Discussion about to change filter in exhaust with 1 um everywhere
  • R134a presentation by Gianluca
  • Presentation of 3D drawings of CPV Humidifier by Sabino
    • LPh confirmed that all the material is available at the workshop except one festo volume
  • Presentation about regulation valves for CMS RPC by Sabino

 