Ad-Hoc Meeting #13 (BT Voluntary Displacements)

Europe/Zurich
865/2-C19 (CERN)

865/2-C19

CERN

Meyrin Site
10
Show room on map

Present: Pierre, Benjamin, Wim, GP, Wolfgang, Mike, Michele

 

-          Septa and quadrupoles are clear for the voluntary displacement

-          For BI equipment (BTVs and BPMs) we should produce drawings as for the septa (including the height of alignment targets to beam and flange axis) - Benjamin

o   For all elements we put the offset wrt beam 3 into GEODE as voluntary displacement

-          Prepare a document describing the understanding we have now – Wolfgang

-          FESA table to be updated with dwgs input, calibration data and mechanical alignment – GP

-          Dedicated items to be clarified

o   BPM00 sign error in FESA?

o   BPM30 offset of 10 mm not visible in CATIA?

o   For both check measurements against drawings - Benjamin

 

                                                                                                                                          Minutes by W. Bartmann

There are minutes attached to this event. Show them.