28 July 2020 to 6 August 2020
virtual conference
Europe/Prague timezone

Physics and throughput performance of the real-time reconstruction for the LHCb upgrade

29 Jul 2020, 19:25
15m
virtual conference

virtual conference

Talk 12. Operation, Performance and Upgrade of Present Detectors Operation, Performance and Upgrade of Present Detectors

Speaker

Renato Quagliani (Centre National de la Recherche Scientifique (FR))

Description

In the beginning of 2021, the upgraded LHCb experiment will use a triggerless readout system collecting data at an event rate of 30 MHz. During the first stage of High-Level Trigger (HLT1), a sub-set of the full offline track reconstruction for charged particles is run to select particles of interest based on single or two-track selections. After this first stage, the event rate is reduced by at least a factor 30. Track reconstruction at 30 MHz represents a significant computing challenge, requiring a renovation of current algorithms and the underlying hardware. In this talk both the computing and physics performance of the full HLT1 chain will be presented. We will particularly focus on the development of highly parallel algorithms optimized for many-core architectures.

Secondary track (number) 13

Primary author

Renato Quagliani (Centre National de la Recherche Scientifique (FR))

Presentation materials