Interlock on stopping extraction when ZS HV off needs to be very carefully checked in commissioning and maybe more regularly (Verena, Bruno)
- anode temperatures to add in logging (Bruno, Francesco)
- spark logging to check, whether correlation with the cycle is possible (Bruno, Francesco)
- BLM interlocking needs consideration with the different running sums (Francesco, Verena)
- Fixed display for CCC needs to be updated? (Bruno, Yannick)
- Alignment optimiser to deploy in an application (Verena)
- Need to prepare what has to be done for the SIS of the voltage, if we need the PPM voltage modulation (Verena, Bruno)
- ZS expert to be present during steps in intensity/# bunches for the LHC beam intensity ramp-up, as for many systems