Present: Beatrice, Roberto, Patrick, Kacper, Andrea, Fred, LPh, Mara, Gianluca, Federico, Fabio, Sabino

Indico: https://indico.cern.ch/event/889808/

 

ALICE #no elog

  • MTR
    • Dummy chamber installed and welded + to add flowcell and pressure sensor
    • Back-up modification done

Reminder:

    • Alarm in power supply: DC MCB trip —> Michal/Patrick to check
    • exhaust pressure regulation does not work
  • CPV
    • Probably water in pipes: fixed by flushing the pipes
    • Humidifier to do the leak test + electrical
  • TPC

Reminder

    • In the purifier the small thermic box triggered (also last year it happened) —> Patrick/LPh to check
  • TRD

Reminder

    • Purifier: to review if keep the safety valve or the rupture disk
    • Purifier: safety valve at the input where we have Ar or Ar/H2 at high pressure —> LPh to check with safety
    • Alarm on power supply

 

ATLAS #2254

  • MDT
    • Re-started
    • Leak found in rack 68 (VBO joint not fully screwed) where we added two channels coming from other racks
    • Rack 68: problem in two flowcells of the new channels added (ch 21&22) —> Michal to check
    • A lot of humidity in the chambers due to the long stop
    • Now the humidity regulation is done with the return of the gas
    • Found a problem of grounding on pressure sensors: pressure sensors changed. Now to verify if the grounding problem is still there
  • RPC
    • Rack 63 in run, regulation valve fully open
    • Idea is to start one rack at the time for checking new leaks
    • Problem with canbus in Rack 63
    • Found leak in buffer
  • Power supplies
    • Changed CSC, TGC and to do Auxiliary
  • TGC
    • System chassis are ready
    • To do the logo to PLC conversion (mixer + liquifier)
    • To do the welding for the liquifier: start discussion this week
  • General

Reminder

    • Power of bande chauffant —> Patrick/Kacper
    • Several electrical problem in ATLAS:
      • See elog 2205, 2206, 2207
      • Patrick to prepare a protocol for the student to identify the failures

 

CMS #2245

  • RPC
    • Disconnection of some leaking chambers
    • Total leak rate ~530 l/h
    • Rack 79: leak on the bubbler and on the supply valve of the rack but access is difficult
    • Problem with heating pipes and relays (see elog 2235)
    • Reminder:
    • Test on rack 67: flow measured 40-50 l/h instead of 4-5 l/h (read by the flowcells)
      • To buy a voegtlin red for the test of flow tests
      • At this point the problem is electrical —> Michal to investigate
    • Missing quick manifold and flowcell in barrel +1 and +2
    • Swap of pipes in rack RE-1 (racks 61 and 65) and RPC 3.1 (racks 63 and 87)
    • Rack 85: to check if dummy chamber is installed, if yes to add pressure sensor connection
  • DT

Reminder:

    • Difficult to re-start the gas system after power-cut —> to do some tests
    • Test for power cut and re-start for the exhaust line —> to do other tests
  • CSC

Reminder:

    • Warning to set-up —> Beatrice/Michal/Roberto
  • GEM
    • System stopped because the pressure of the membrane increased (0.4 bar)
      • When Andrea disconnected and connected the plastic pipes, the pressure went to zero: why?
    • Missing capillary in the pump module for the membrane
    • To finish DSS signal (0.5 day electrical work)
    • Missing some flexible pipes in GE2.1+

 

LHCb #2253

  • RICH1
    • again stop, so purge
    • to check if we take air —> Mara
  • RICH2
    • still two weeks in CO2 to test the membrane
    • then inject Air —> Patrick to check with C. Frei
    • to add line for analysis “supply to detector”
  • MWPC
    • Leaks in Purifier, Mixer and Exhaust. Only in Exhaust found but not repaired. Other not yet founded
    • Problems with pressure sensors: replaced
    • Default in the optical fibres
    • It stays more than one week without back-up because back-up was left closed after the dismounting of the MWPC/GEM distribution racks
  • CF4 Recovery
    • To use battery A to finish and then exchange it with new battery (the one with single bottles)

Reminder:

    • Interlock of Ar/H2 does not work —> Michal/Patrick to check
    • Problem with Profibus cable/connector module —> to understand where —> Patrick

 

PIQUET

  • Nothing to report

 

GENERAL

  • MFC calibration
    • Output pressure is not chosen during the calibration
    • Sometimes flow is not the same of default of MFC but it has been changed with previous calibration: for the new calibration we keep the flow we see in WinCC-OA that is the same of the old calibration
    • As general rule, do not change the input pressure of the device. In case you want to change, we need to check if it worth to do
  • Exhaust
    • To think to put safety valves in Exhaust
    • Now we have 5um: to check if to put the 1um
  • Capillary pipe for the pressure sensor of the pump membrane: to do everywhere
There are minutes attached to this event. Show them.
    • 09:00 09:10
      Gas Elog 10m
      Speaker: Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR))
    • 09:10 09:20
      Overview of planning LS2 10m
      Speaker: Beatrice Mandelli (CERN)

      PLC:

      https://its.cern.ch/jira/secure/WBSGanttMain.jspa?filter=BOARD_345

      LS2:

      Departments/PH/Groups/TA1/Gas_group/002-LS2

    • 09:20 09:25
      Piquet interventions 5m

      http://eloggas.cern.ch/GAS_PIQUET/

      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Kacper Jerzy Kapusniak (CERN), Michal Zbigniew Zimny (CERN)
    • 09:25 09:30
      Activities on-going 5m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN)
    • 09:30 09:50
      Plan of LS2 activities 20m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN), Roberto Guida (CERN)
    • 09:50 11:15
      Gas systems for the LHC experiments
      • 10:05
        ALICE 5m
        Speaker: Louis-Philippe De Menezes (CERN)
      • 10:10
        ATLAS 5m
        Speaker: Kacper Jerzy Kapusniak (CERN)
      • 10:15
        CMS 5m
        Speaker: Andrea D'Auria (CERN)
      • 10:20
        LHCb 5m
        Speaker: Patrick Carrie (CERN)
      • 10:25
        Gas analysis: standard H2O/O2 5m
        Speaker: Louis-Philippe De Menezes (CERN)
      • 10:30
        Gas web-page 5m

        http://test-gasmonitoring.web.cern.ch
        https://ep-dt-gasanalysis.web.cern.ch

        Speaker: Beatrice Mandelli (CERN)
      • 10:35
        Software 10m
        Speaker: Michal Zbigniew Zimny (CERN)
    • 11:15 12:05
      Gas System developments
      • 11:15
        Gas System Test-Bench 10m
        Speakers: Fabio Bordon (CERN), Sabino Zagaria (Universita & INFN Pisa (IT))

        nothing to report

      • 11:25
        CMS CF4 recovery 10m
        Speakers: Fabio Bordon (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 11:35
        LHCb RICH2 CF4 recuperation 10m
        Speakers: Federico Consolaro (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 11:45
        R134a Recuperation 10m
        Speakers: Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Ian Crotty (University of Wisconsin Madison (US)), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 11:55
        AoB 10m
        Speakers: Fabio Bordon (CERN), Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Sabino Zagaria (Universita & INFN Pisa (IT))
    • 12:05 12:15
      FSU & Jobs status 10m
      Speaker: Frederic Merlet (CERN)
    • 12:15 12:25