• normal operation in general at T1. But in min-safe mode (access to SDCC will be permitted only for hardware failures or to fix unexpected outages until further notice)
  • ARC-CE/gridftp interface enabled for ATLAS GPU jobs on the IC cluster. Will switch to gridftp submission mode on the CERN harvester side soon.
  • cvmfs and HTCondor upgrade ongoing on the farm nodes, in rolling fashion.