# Minutes of the meeting: Teleworking
###### Date: Wednesday, 25 March 2020
***
## Participants
Marta, Gerard, Franco, Salvador, Bernardo, Stathis, Ruben, Michal, Maryline, Olivier, Guillaume, Ioannis, Gaelle, Yacine, Paula, Vincent.
**HEALTH STATUS: Everyone is fine without any COVID-19 symptom!**
## Main points
* Email is becoming slower some times with delays mainly during the email creation and the send especially if it contains attachments.
* Confirmed! Stathis and Ioannis are the main responsible for the TW section meetings.
* It is not any more clear how we can use the Swiss health system... CERN is working on that and we will receive an update in due time.
* **TW general rules:**
**A**. 1/day: check email
**B**. Be on standby (!), while being easily reachable by phone or email.
* **Quarantine**: The initial plan goes up to 6 weeks in total. However, this will change dynamically based on the circumstances.
## Marta's notes
* The Wednesday's TW meeting becomes officially the SM18 TW section meeting.
* The rest of the meetings are going to be arranged by the supervisor(s) on a regular base when and if it is needed.
* A brief explanation concerning the automated received EDH requests (timeslots: TW and family/kids).
There was a group request/agreement concerning the teleworking, where it will be concretely defined in the upcoming weeks. The two categories are, a. special leave: (family and kids) and b. teleworking (occasional). The technicians have been declared as the special case of "half-half".
** In case of a problem with the teleworking discuss it directly with Marta.
* PjAs: Talk with your University's responsible in order to get theirs agreement on TW.
## Around the table discussion
**Bernardo**:
Review a optical fiber proposal, and meeting participation about the MQXFS.
**Stathis**:
Finished draft 2 of the special test of the diode MQA0408. Finished the cross-check of the EDMS/MTF diode reports from 2014. Started the development of the automated diadem graphical report of the quadrupole diodes.
**Franco**:
11T presentation and OAK to Carpenter integration. This will probably be finished in a couple of days.
**Gaelle**:
Documents preparation.
**Gerard**:
Ruben's tuitoring, spikes study with Michal et al., document preparation and supervising. Regularly patrol the building.
**Guillaume**:
Working on the QPS's switch-cards.
**Michal**:
Spikes study meeting. Flux jumps analysis, magnets data mining, and more. Oracle Server meeting. DB connection for Carpenter. Report preparation.
**Ioannis**:
Carpenter v2 development and more.
**Maryline**:
QH commutator of Cluster G. Getting offers and documentations.
**Salvador**:
Implement analysis tool for the MQXFS
eRMC data analysis and report preparation.
**Yacine**:
Document preparation.
Cluster F and A: will be included into the meeting loop.
**Paula**:
Some problems with the Sharepoint and
document preparation.
**Vincent**:
Working on the design and the documentation of the diode instrumentation rack. Start with the reorginazation of the matest folder concerning this rack.
**Ruben**:
Meeting with Gerard on the current decays which will be studied analytically and simulatively. Introduction to the THEA software.