GAS M&O meeting 16 April 2020
Present: Beatrice, Roberto, Andrea, Patrick, Kacper, LPh, Fred, Michal, Mara, Gianluca, Sabino, Fabio, Federico, Leonardo
Indico: https://indico.cern.ch/event/909752/
CHECK Gas Systems
ALICE
TPC
- by mistake LPh started the cO2 absorber and we have a big loss of gas. Problem fixed by piquet
TRD
- two stops due to profibus problem but able to restart as system
- Patrick and Fred went on place: found two profibus connectors not well closed. These connectors were installed with the new PLC
- Profitrace installed in place to check for other possible problems
ATLAS
CMS
- Lower of gas flow for the chilled mirror of the humidifier
- Humidifier of RPC is stable because is not injecting any water. This is due to the fact that we don’t use the purifiers
- DT pump maintenance: change of membrane for pump 1 and 3
- Ar/Co2 batteries almost empty. New batteries already at P5
LHCb
GENERAL
- Chilled mirror needs between 10 and 20 l/h. The lower is the flow, the higher is the time to perform the measurement
- Profibus check has to be done before and after the change of PLC
- Summary of status of alarms done by Mara
- Level of PGS sometimes is > 100% —> Michal to check
- PGS list of sensors not working/not existing: missing ALICE, CMS and LHCb
Actions:
- To prepare a list of sensors not working or missing in PGS —> Experiment technical responsible
- Excel file for alarms prepared weekly by Mara —> Experiment technical responsible to fill