Xiaowei Wu: Sub-harmonic deflector design progress 

 

Task 1: 

Task 2:  Excused.

 Task 5: 

 Task 4: 

Initial design through linear and non-linear beam-wave interaction theory. 

The results were validated by PIC simulations. 

Initially 2 MW then 3 MW output power was achieved. 

Magnetron injection gun (MIG) was optimized to achieve the required beam quality. 

Thermal management when operating at PRF 1 kHz was investigated. 

Depressed collector and output microwave window were analyzed. 

 

Igor: completed the design of the 20 beam klystron design. Device is 10 cm long. Everything is designed including windows, cooling... approx. Overall cost 1.6m Euro 

 

Task 3 and deliverable writing: 

 

Questionnaire from WP6: