DFC: permissions checked at each directory level. If the LFN starts with a double slash, the DFC goes into an infinite loop (v6r22pXX, most probably not fixed in later versions, but to be re-checked).
Investigate on new installation getting broken…? Not clear what was the issue.
v7r0 is in production since Monday, also with Pilot3. Pilot files taken from the web portal: not the most ideal of solutions, but looks like working fine.
NTR
The connection to OSG is working fine. COVID-19 researches with that, running smoothly.
Migration to v6r22. Long certification process of Belle2 is slowing things down there.
DIRAC v7r0p20 in production. Environment isolation issues -> suggested to move to v7r0p22 as it at least uses DIRACOS v1r11.
Some issues with EOS based WebServers -> suggested to open tickets and put LHCb crew in CC for next cases.
NTR
NTR
v1r11 included in DIRAC v7r1 and v7r0p22+
NTR
diracdoctools made python3 compatible.
Slowly moving documentation for options of services and agents in the ConfigTemplate.cfg. Not touching FrameworkSystem right now.
Main topic for v7r2. The extension will be merged in DIRAC.
NTR
NTR
NTR
Already there, or PRs ready:
Requiring work:
merge OAuth2 in DIRAC
JSON encoding
Remove Pilot2 code
Part of WebApp Core code needs to be moved to DIRAC
RucioFileCatalog: there is pre-production version of the catalog provided and tested by Belle2.
https://github.com/DIRACGrid/DIRAC/issues/4544: TimeLeft and allocation of jobs, mostly for HPCs, long and technical discussion.
https://github.com/DIRACGrid/DIRAC/issues/4574 : what we want from the plotting (discussion thread)
This might be the last BiLD meeting for Zoltan, who is leaving LHCb and CERN after more than 10 years in the team. Thank Zoltan for your great work and commitment, we hope to see you soon again.
Next week: first hackathon for v7r2? Maybe a bit premature, we will see in the next days.
Next BiLD in 2 weeks.
After the release:
Operations:
Bkk: