13:00
Reliability of the Quench Protection System
-
A. Vergara
Reliability of the Quench Protection System
A. Vergara
13:00 - 13:20
13:20
LHC beam dumping control system
-
S. Sauvant
LHC beam dumping control system
S. Sauvant
13:20 - 13:40
13:40
Report from the LCC
-
R. Schmidt
Report from the LCC
R. Schmidt
13:40 - 14:00