HL-LHC BPM Design
15:30 → 15:50
Follow-up on actions from the previous meeting
-
[x]Simulation generally looks ok, Gerhard will discuss with Vincent, and the results will be presented during the design review meeting.
-
--> not yet discussed, but will be done soon
-
21.10: informally OK, will be confirmed during the review.
-
-
-
[x]do we braze the interface and cooling link or weld it?
-
--> answer from Laurent: ultrasound welding
-
--> would be good to discuss once again with VSC and Fritz --> Dmitry will contact N. Kos, and maybe Nicolas will discuss with Fritz after
-
discussed with N. Kos, ultrasonic welding is more tested solution
-
-
-
[x]an email with the entire process will be prepared and sent to VSC and MME colleagues --> action Dmitry
-
--> the cost estimate to be done with MME (Dmitry)
-
21.10: meeting with Emilien on Friday, drawing is needed --> action Nicolas
-
-
-
[x]D2 integration --> meeting with Arnaud last week (Nicolas), cables are still to be designed. Official green light for freezing BPM design can be requested, but to be checked with VSC.
-
--> information received from Arnaud and Elodie, seems everything is OK, to be confirmed --> Nicolas
-
--> Electrical cables still need to be advanced (interferences found in the 3D), will be fixed by Nicolas.
-
to be discussed in integration session
-
-
2. Plans for design documentation release
-
[]list of persons for drawings approval procedure to be prepared --> action BI (WP leaders, ATS group leaders)
-
[]21.10.20 --> contact Hector or same list as functional specification?
-
[]all drawings must be released before launching the approval procedure --> action all
3. AOB
-
[x]Review: Gerhard discussed with Delio (will not attend the review) and Vincent
-
[]Tubes interfaces and routing: check what we have on Q1 side.
-
[x]Meeting should be organized with Fabrice and Arnaud together to check the integration --> action Nicolas
-
[x]Proceed with 2nd control of transitions drawings for type B --> action Gerhard
-
[]Release simplified BPM body LHCBPMQSTMB0001--> actions Dmitry (ready for check), Nicolas (check), Gerhard (release)
-
--> status:
-
-
[x]Check cooling tubes interfaces and orientation with VSC (Fabrice) --> action Nicolas, probably Monday next week, Nicolas will organize the meeting with Fabrice and us, if possible
-
action closed
-
-
[]Check the maximum force the welding seam between the cooling tube and the BPM body can withstand --> action Dmitry, Gerhard
-
[]Follow-up on quench study with Susana --> action Dmitry
15:50 → 16:10
Design of covers and springs for type B BPM
-
1 cover instead of two
-
commercial springs feuerherdt
-
Brackets design doesn't allow extra angles on the cooling tubes --> SmarTeam number and access give to Nicolas --> action Dmitry
-
For type A --> brackets to be integrated as well
-
Check brackets integration with Fabrice --> action Nicolas
16:10 → 16:20
Integration of BPMs and welding machines representation on the drawings
-
Nicolas: we already have machines in 3D models
-
Preliminary 3d will be prepared and agreed with Fabrice
-
Cooling tubes design will have to be agreed with Fabrice
-
Contact person for D2 integration - Elodie
16:20 → 16:30
AOB
Electrode design --> progress made, on track, next week the discussion with Karol can start.
-
D2 --> button design progress made, need to produce drawings for discussion with suppliers and more realistic 3D model --> need to change one dimension on the D2 body --> action Michal and Nicolas (organize meeting, Monday 26.10)
-
D2 --> extra 1 mm on the aperture --> to be checked, action Michal, Nicolas
Other projects? -- > next two weeks BPM work can be done (60% of Nicolas time)