Design Updates (Nicolas and all) + priorities definition
• New radii for UHV flange: 4x 3D models to update
type A and D2 to be done
type B is done
• Absorber covers: 3D still ongoing
springs fixation preliminary design done
more detailed 3D will be available --> action Nicolas
spring properties to be checked with supplier (Feuerherdt) --> action Gerhard
• Cooling tubes length
implemented already on tubes parts (assemblies and 2D drawings to be updated) --> will be completed before the review, action Nicolas
• Transition for D2
following the BS modification, transitions to be modified, 3D done, 2D done, action close
Michal confirmed to Nico Kos that BPM change has been completed (action for BI in ECR)
• New Reinforcement supports (4 designs)
3D for 4 types done
2D for two types done
• Modification of main body A for cooling reinforcement
3D done, 2D to be done
• New Feedthrough for D2
waiting for next iteration (drawing to be released asap, waiting for the next iteration from procurement process feedback)
• Update of D2 main body external dimension (140->130mm) + inner changes
3D done, 2D to be done (maybe already done, to be checked --> Nicolas)
• Welding machines integration study
drawings exist for Type B (ready by Friday evening --> Nicolas)
drawings and 3D for Type A --> to be checked
D2 --> 3D and 2D
hide all the non-completed parts from integration models --> action Nicolas, this was agreed with Delio
3D views with welding machines to be prepared for the review --> action Nicolas
• Comments on Heeral test bench
low priority
Electrodes Design (Michal)
was not discussed