New AD Electron Cooler Project Review
Project review for new AD electron cooler
Date: 19th of May 2022
Location: https://cern.zoom.us/j/9421195725
The charge of the review is to scrutinize the design features + documentation status and agree on committing AD-CONS budgets in the purchase of some of the main components (magnet , mechanical structure, vacuum system).
Objectives of the reviewers shall be to examine the following:
- Are the most important specifications and performance expectations for the new AD cooler well identified and addressed correctly by the project ? Maximum Electrons energy ? Current stability ? Reliability tests ?
- Have the requirements been consistently translated into functional and technical specifications ?
- Have the technical choices for the various systems (optics, beam dynamics simulations, magnets, power supplies, HV, instrumentation, vacuum, interfaces, integration, control systems) been assessed by concerned equipment groups and documented ?
- Are we confident the system performances with the proposed design reach or exceed the requirements ?
- Are the design of the magnets, vacuum systems and mechanical parts finalised and fully integrated in the machine ? Is the documentation sufficiently detailed for these parts to enter the tender phase (technical drawings, specifications, call for tenders when appropriate) ?
- Do the infrastructure and test facilities match availabilities ?
- Is the overall project schedule in line with the planned milestones with enough margin ? Is the planning adapted for installation in LS3 ?
- Does the planned spending profile corresponds to the AD-CONS budget planning ? Is the present total budget still adequate ?
- Are the resources adequate ? Are there possible shortfalls ?