Session

Machine optics and set up considerations

20 Mar 2017, 11:30

Conveners

Machine optics and set up considerations: Machine optics and plans

  • Adriana Rossi (CERN)

Presentation materials

There are no materials yet.

  1. Stephane Fartoukh (CERN)
    20/03/2017, 11:30
  2. Roderik Bruce (CERN)
    20/03/2017, 12:10
    • Minimum half gap of the collimator inner jaw during the tests (is it related to the wire current?
    • Machine protection issues
    • Feedback on “weak” beam parameters
    Go to contribution page
  3. Rogelio Tomas Garcia (CERN)
    20/03/2017, 12:40
    • Estimate of how long it will take to get to commissioned a beam with 2 trains for 2 following scenarios: using ATS ’standard’ optics as for physics, and with P1 unsqueezed
    • Suggest which measurements should be done during commissioning
    • Flat optics MDs and readiness.
    Go to contribution page