1-15, 04, 2006
The activities of the EUChinaGrid project;
----------------------------------------------------------------
The first grid tutorial of the EUChinaGrid porject was held in Beijing in 3-7 Apr.
PMB meeting was held in 4th Apr. in Beijing.
Major work for GD-OPS & GD-ITR; major changes in workplan
----------------------------------------------------------------
Built ETICS enviroment for ETICS on various platform, such as SLC3(4)/Debian/WinXP. Include installing
and configuring basic OS and Condor etc. Setup SSH server on window. Install ADSM etc. Computer system
management and troubleshouting.
VOMRS technical support. Solve some technical problem. Find bugs. contact with VOMRS developer for
disscussing about improving VOMRS. Test VOMRS database performance.
Major issues arising
--------------------
Major events attended (include links to event/presentation)
---------------------
Plans to attend/organize major events (intra-EGEE and others)
-------------------------------------------------------------
Holidays during the periond
------------------------------------------------------------
0 days
16-30, 04, 2006
Major work for EUChinaGrid and The activities of the EUChinaGrid Projetc
-------------------------------------------------------------------------
Read the slides of the project meeting which was held in Beijing in 04/04/2006 to know the project status
and progress. My name is added officially in the WP2/WP3/WP4/WP5 mail list.
The people in WP3 collect the information about how authorisation is carried out in CNgrid and CA in IHEP and
other CAs in China. Read some related document and try to understand them.
Major work for GD-OPS & GD-ITR; major changes in workplan
----------------------------------------------------------------
VOMRS technical support and test. Solve some technical problem.Install and configure VOMS oracle server and
new version vomrs-1.2-3 in General and LCG type at the same host. Test the new version vomrs functionalities.
Report the bugs to developer. Prapare putting voms102,3 in production.
Major issues arising
--------------------
Major events attended (include links to event/presentation)
---------------------
Plans to attend/organize major events (intra-EGEE and others)
-------------------------------------------------------------
Holidays during the periond
------------------------------------------------------------
0 days