Activity of the month

Europe/Zurich
    • 08:00 08:20
      Pedro Andrade 20m
      *WP12* - watermarking demo for EGEE review - gLite technical support to UNIBAS, FhG, USG (CE configuration, WMS/CE installation, VOMS client installation) - monitoring of the development infrastructure availability *WP17* - monitoring of the testing infrastructure availability *WP18* - configuration/execution of the deploy-test in ETICS - migration of the ETICS deploy-test system - meetings with Alberto, Meb and Guillermo about ETICS reports and ETICS servers - definition of Savane tasks for the integration testing activity - plan for production of DILIGENT release plan (guidelines for RC Alpha definition using Savane) - T1.8.4 re-organization - "DILIGENT usage of ETICS" presentation in EGEE06 (slides preparation and presentation) *WP31* - DILIGENT-EGEE MoU review - EGEE06 conference abstracts comments - "DILIGENT prototype and infrastructures status" presentation in EGEE06 (slides preparation and presentation) - monitoring of the pre-prod infrastructure availability *WP42* - participation to the EGEE conference (2 presentations) *WP43* *Other* - elaboration of IMR12 for WP1.2, 1.7 and 1.8 - elaboration of DILIGENT second year PAR - watermarking demo phone conferences - TCom phone conference - participation in EGEE06 *Holidays*
    • 08:20 08:40
      Alexandre Duarte 20m
      Alexandre Duarte 01-30 September 2006 Major work for EELA ------------------------------------------------------------------------- SAM maintenance. Installation of a new SAM Client instance at UFRJ Participation in the EELA ROC Submission and tracking of tickets to the EELA Support System based in the SAM Results to do: Transfer the SAM Server from CERN to CIEMAT/Spain Major work for GD-OPS ------------------------------------------------------------------------- Final preparation to Join the CERN ROC in October Major events attended (include links to event/presentation) ------------------------------------------------------------------------- OurGrid/EELA Workshop as Speaker (31/08 to 01/09) http://indico.eu-eela.org/conferenceDisplay.py?confId=56 EELA Conference in Santiago as Speaker (04/09 to 05/09) http://indico.eu-eela.org/conferenceDisplay.py?confId=32 EELA Tutorial in Santiago as Tutor (06/09 to 07/09) http://indico.eu-eela.org/conferenceDisplay.py?confId=52 EEGE Conference in Geneva (27/09) http://indico.cern.ch/conferenceTimeTable.py?confId=1504 Holidays during the period ------------------------------------------------------------------------- 0 day
    • 08:40 09:00
      Florida Estrella 20m
      BalticGrid *SAM hosting *DSA13 review EELA *H/w hosting @ CERN *SAM hosting *Review preparation support EUMed *1st conference, PMB, Internal meeting, minutes & slides: http://indico.cern.ch/conferenceDisplay.py?confId=6323 *SAM hosting *complete deliverable D22 EUChina *1st conference, PMB, Internal meeting, minutes & slides: http://indico.cern.ch/conferenceDisplay.py?confId=6324 *SAM hosting *A34 survey continuation with JL H-e-C *1st tutorial prep & feedback, agenda & feedback http://indico.cern.ch/conferenceDisplay.py?confId=5179 *WP5 questionnaire review SEEGRID2 *PJAS hiring EGEEII *EGEE06 conference - RP track, HealthGrid session, SEEGRID2 workshop, EUChina IPv6 session, EUChina Interoperability session, & RP Infosheets dissemination
    • 09:00 09:20
      Roberta Faggian Marque 20m
      DILIGENT *WP1.2* - planning of watermarking grid tests *WP1.8* - meeting with ETICS - T1.8.4 re-planning of the activity - plan for production of DILIGENT release plan, discussion with ENG and CNR - prepared a template for partner's submission of their WP1.8 tasks to Savanne - revision of presentions for EGEE06 (ETICS and prototype) *WP3.1* - finalised DILIGENT MoU revision including ExCom comments, sent to NA4 - mailing list subscriptions revision and update - provided DILIGENT contribution to EGEE06 RP track presentation - TCom confcalls *WP4.2* - participation to the EGEE conference - D4.2.3 review *Others* - ExCom meeting: IMR review - IMR contributions for July-August submitted - coordination phone meeting ERCIM, UoA, CNR - DoW 25-36 revision and additions - Year-2 PMs and activity report for coordinator and internal audit - Periodic Activity Report for year 2 revised and sent to coordination - CERN feedback on consortium performances sent to Donatella EGEE - PO meetings - RP-LO meeting: preparation for EGEE06, projects registration - RP-LO mandate and PoW revision with Erwin - meeting with HH about: EGEE related project stamp and new ideas + EGEE user community portal + EGEE RP infosheet revision - preparation of RP slides for Erwin presentation at EGEE06 - ISSeG, AssessGrid reviewed and registered to list of registered projects - update of EGEE06 pages - update of RP pages in EGEE technical site - many twiki updates - RP-LO meetings - interviewed NA4 and NA3 activity leaders EGE-RP - budget status update and revision for RPs - section meeting - activity reporting to Bob - getting several new subscriptions to EGEE newletter, metaware to re-contact these persons to suggest subscription to EGEE community portal - EELA meeting: Alexandre presentation about OurGrid/gLite interoperability - preparation of meeting with FI - meeting with FI department about support to EU projects and RP needs OTHERS - Met Jean-Yves about eContent+ proposal - Support for Belief workshop organisation at CERN - 1 day of holidays
    • 09:20 09:40
      Lanxin Ma 20m
      Minutes
    • 09:40 10:00
      Rolandas Naujikas 20m
      1-30, 09, 2006 Major work for BalticGrid and The activities of the BalticGrid Project ------------------------------------------------------------------------- SFT gone. SAM maintenance. Debugging and solving of glite-CE problems. Security updates at VU-MIF-LCG2. glite-UI upgrade to 3.0.2 with latest security update. Major work for GD-OPS & GD-ITR; major changes in workplan ---------------------------------------------------------------- Maintaining production glite-WMS (rb101-rb103,rb109) at CERN. Maintaining production classic_SE (lxb2003,lxn1183) at CERN. Analysis of interaction between glite-WMS and glite-CE. Debugging and solving glite-CE problems. Security updates at PPS. Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- EGEE'06 conference (NE ROC and SA1 meetings) Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- BalticGrid 2nd All Hands Meeting in Riga, Latvia on 4-6 October 2006. Holidays during the period ------------------------------------------------------------ None
    • 10:00 10:20
      Marc Ozonne 20m
      Sept 04 - Sept 08 Preparing the GridKa school practical session on gLite installation and globus installation together with the practical sessions coordinators. Sept 11 - Sept 14 GridKa Grid Computing School at Karlsruhe, Germany gLite installation course Globus installation course Sept 18 - Sept 22 Write CSC06 Grid Track report Write GridKa school report Sept 24 Attend to the "Training the trainers" training Sept 25 - Sept 29 Attend to the EGEE06 conference at Geneva, Switzerland
    • 10:20 10:40
      Konstantin Skaburskas 20m
      ToDo .......... Konstantin Skaburskas 1-15 September 2006 == Major work for Health-e-Child -- 'ops' VO added to HeC VOMS server -- Installation/configuration of UI on hec-maat-devel1.cern.ch -- Work on questionnaire for HeC software developers == Major work for GD-OPS -- Updating production FTS via Quattor -- Testing of new release of lcg-CA package -- Update and testing of PPS WMSs to support memmory requirements in job specifications == Major work for GD-ITR -- Inst/conf of special WMS for CMS on Production == Major issues arising - == Major events attended (include links to event/presentation) -- 11th September, HeC G/W developers meeting/tutorial (Maat, CERN) == Plans to attend/organize major events (intra-EGEE and others) == Holidays during the periond 0 days -------------------------------------------------------------- Konstantin Skaburskas 1-15 September 2006 == Major work for Health-e-Child -- 'ops' VO added to HeC VOMS server -- Installation/configuration of UI on hec-maat-devel1.cern.ch -- Work on "Infrastructure Requerements Questionnaire" for HeC software developers == Major work for GD-OPS -- Updating production FTS via Quattor -- Testing of new release of lcg-CA package -- Update and testing of PPS WMSs to support memory requirements in job specifications == Major work for GD-ITR -- Inst/conf of special WMS for CMS on Production == Major issues arising - == Major events attended (include links to event/presentation) -- 11th September, HeC G/W developers meeting/tutorial (Maat, CERN) == Plans to attend/organize major events (intra-EGEE and others) To attend: -- EGEE'06 - 24, 26 September -- Gidla HeC specific API tutorial on 24-25 September == Holidays during the periond 0 days -------------------------------------------------------------- 16-30 September 2006 == Major work for Health-e-Child -- Revisions of/additions to "Infrastructure Requerements Questionnaire" -- Help UWE partners in setting up their site configuration -- Inst/conf of laptop to support HeC development environment -- Testing of client/server authentication software on HeC G/W == Major work for GD-OPS -- Weekly patches applied -- Couple of bug reports -- New responsibility - MON_e2emonit (inst'd/conf'd) == Major work for GD-ITR - == Major issues arising - == Major events attended (include links to event/presentation) -- EGEE'06 - 24, 26 September -- Gidla HeC specific API tutorial on 24-25 September == Plans to attend/organize major events (intra-EGEE and others) -- To attend: - Gidla HeC specific API tutorial on 10-12 October == Holidays during the periond 0 days
    • 10:40 11:00
      Domenico Vicinanza 20m
      Domenico Vicinanza 1-30 September 2006 Major work for EUMEDGRID WP3 and Testing ---------------------------------------------------------------- It continued the SAM (System Availability Monitoring) testing and maintainance of the server and client components - The SAM server has completely configured on the Linux CERN machine lxb6114.cern.ch - The SAM client has been installed on a Linux UI in Greece (ui01.isabella.grnet.gr) Fixed some installation concerns mainly due to the lack of some installation and configuration scripts and the missing documentation for some of the procedures. The as-of-today status is a working server connected with a stable client. Results available at: https://lxb6114.cern.ch/sam/sam.py It continued the work on the SAM installation documentation (Server and client), to be syncronized with the online Twiki page maintained by Alexandre Duarte http://goc.grid.sinica.edu.tw/gocwiki/Installation_Manual Started integrating some WMS tests coming from Gilbert Grosdidier's testsuite within SAM on the lxb cluster. To do in the next future: - move the server installation from the current machine on the lxb cluster to an eumed one (I am in touch with CNAF) Major events attended (include links to event/presentation) ---------------------------------------------------------------- - Attended the EELA conference (where I was invited to give a talk about a sonification package I developed when I was working at the Univ. of Salerno, Italy and which has been officially taken as one of the regional applications for the EELA project), held in Santiago (Chile), September 4th to 5th - Attended the EELA Tutorial as tutor (giving six tutorial lectures), held in Santiago (Chile), September 6th to 7th. - Participation to the EUMEDGRID Project Meeting (September 14th) and Conference (September 15th), Rome, University of Roma3. Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 0 days
    • 11:00 11:20
      Valentin Vidic 20m
      Valentin Vidic 1-15 09 2006 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the periond ------------------------------------------------------------ 15 days Valentin Vidic 15-30 09 2006 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- * Debugging problems with proxy renewal on pbs job manager * Writing MoU annex for D4.1 requested by Gabriel Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- * ROC on Duty for one week Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- * two days at EGEE06 conference Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the periond ------------------------------------------------------------ 7 days