DQW Crab Cavities Production - Manufacturing Review

Europe/Zurich
RI

RI

Description

The scope of the review is to ensure that the required quality is guaranteed during the manufacture and acceptance of the various equipment for HL-LHC

The committee reports to the HL-LHC Project Leader, who distributes the review report to the Project Office, to the GLs/WPs, to the concerned DH, and to the DAT when considered relevant.

Mandate on https://edms.cern.ch/ui/file/1907344/0.95/HL_MR-Mandate.2018.05.15.pdf

    • 08:30 08:40
      General Overview of the contract 10m
    • 08:40 08:45
      Adequateness and validity of the certification 5m
    • 08:45 09:15
      Completeness of the manufacturing inspection plan 30m
      MIP
    • 09:15 10:30
      Review of Manufacturing and testing procedures 1h 15m
    • 10:30 10:50
      Coffe break 20m
    • 10:50 11:45
      Implementation of HL-LHC documentation management system 55m
    • 11:45 12:30
      Open discussion 45m
    • 12:30 13:30
      Lunch Break 1h
    • 13:30 15:45
      Check spaces and site organization for: manufacturing, storing of components, storing of finished products 2h 15m
    • 15:45 17:30
      Draft report prepation 1h 45m
    • 17:30 18:00
      Presentation preliminary report 30m