Draft:
Present: Nicholas, Vincent, Emiliano, Gunn
Discussion:
- Ceramic ready for sign and ask for quote/delay, we sign the drawings in next days
- EN-MME will look for a standard electrical feedthrough for the cathode heating on the back flange
- SY-BI-XEI (Jean) will take care of the tantalum foil (order and install)
- Suggestion is that Jean does the assembly in metrology lab
- Write steps for the tests plans for EN-MME to know what we will do with the gun when its ready
- Once gun is on test bench, it doesn't go back to Atelier
- Big DN200 flange on the ceramic assembly is for axis refernce
- Small DN100 flange (being outside solenoid) and the grid tube (without vacuum chamber) are good reference for alignment/metrology
There are minutes attached to this event.
Show them.