Activity of the month

Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
    • 08:00 08:20
      Roberta Faggian Marque 20m
      DILIGENT WP4.2 - gCube logo update - submission to EGEE07 RP track - provided input for the organisation of European Information Space event - future dissemination events/plans/material/expenses/etc. phone meeting, July 26 WP1.8 - organisation of f2f integration and testing meeting in Pisa - integration/testing phone meeting 06 July - preparation for RF f2f meeting - integration and testing f2f meeting, July 11 Rome - integration and testing phone meeting, July 20 WP3.1 - introduction of openlab summer student to DILIGENT/EGEE/CERN - meeting with openlab SS OTHERS - ExCom phone meeting, July 11 and July 23 EGEE RPLO - Collection of requests for EGEE07 RP track - Coordination for booth/demo abstracts submission from RPs - Participation to AA meeting - Initiated actions based on review recommendations - several RPLO meetings - confirmation of RP session and programme preparation - EGEE07 programme committee meeting - work with NA2 for achievement page - provided input to EGEE-III risk analysis - update on EGEE-III relate FP7 projects EGE/RP - J.Shade move from RP budget to EGEE-II SA1 - J.Shade introduction to PPT - Discussions about personnel/renewals/new contracts, several meetings - revision of SEEGRID-SCI budget after cut - revision of D4Science budget - meeting with Anna/Bob about personnel - GPF for new FP7 projects - session meeting: report from OPS meeting - personnel planning - personnel meetings HOLIDAYS - from 12 to 19 July - Monday July 30
    • 08:20 08:40
      Pedro Andrade 20m
      WP1.2 (0) - support to FhG on gLite CE WP1.7 (1) - support to 4DSOFT on ETICS usage WP1.8 (8) - maintenance of the deployment testing infrastructure - execution and monitoring of deployment testing on integration build 0.2.7 - integration of RB portlets and gridsphere patch - participation in release Beta weekly phone meeting (6, 20, 27) - RF meting: organization, slides preparation and participation (1) - update of the deployment test tool for RF - ETICS preparation for RF deployment tests WP3.1 (7) - support tn the certification of the 3 new PPS sites - support to the installation of gLite in the 3 new PPS sites - relocation of "diligent" VO to ENG VOMS server - DILIGENT "data challenges": discussion with PPS admins and monitoring WP4.2 (1) - gCube logo improvements discussion - future dissemination events/plans/material/expenses/etc. phone meeting (27) - elaboration of an abstract for the EGEE07 demo competition WP4.3 (0) Other (2) - analysis of the current gLite monitoring tools - summer student workplan definition and meetings - Florida presentation about EGEE SA1 (26) - participation in TCom meeting (17-19) Holidays (3) - 13 full day - 23 full day - 24 full day Last Update - 31 July
    • 08:40 09:00
      Dusan Vudragovic 20m
      Dusan Vudragovic July, 2007 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- - Finalizing and sending D3.1b (Infrastructure Deployment Plan) for final revision and quality control - Installation of new instance of SAM client at AEGIS01-PHY-SCL - Due to AEGIS01-PHY-SCL cluster reconstruction WiatG instance is moved to another machine - On PPS people request PPS BDII is added to WiatG tool - New BDII (i2g-ii01.lip.pt) and VOs (imain, itut, iplanck, itest, iusct, imon, ibrain, ifusion, ienvmod, ihep) in WiatG - Installation of new WiatG instance for the purpose of the Health-e-Child project http://hec-maat-server1.cern.ch/WiatG/pl/WiatG.pl - Creation of CH support group in SEE-GRID helpdesk - SEE-GRID SAM supporter - SEE-GRID helpdesk activities This month I was finalizing D3.1b (Infrastructure Deployment Plan) and I sent it for a final revision and quality control. New SAM client instance at AEGIS01-PHY-SCL was installed by me and it will be used for testing. Due to cluster reconstruction of AEGIS01-PHY-SCL, BDII has been moved to another machine. For this reason WiatG tool is moved also, but it is still reachable at the same URL. On PPS people request PPS BDII is added to WiatG tool. On South West Europe people request information produced by Int.EU.Grid information system is now visible in WiatG. There is a new BDII (i2g-ii01.lip.pt) and several VOs (imain, itut, iplanck, itest, iusct, imon, ibrain, ifusion, ienvmod, ihep). Together with Konstantin Skaburskas (Health-e-Child) I installed new instance of WiatG tool. This instance will be used for the purpose of the Health-e-Child project (http://www.health-e-child.org/), but it supports SEE-GRID project as well. The instance is located at http://hec-maat-server1.cern.ch/WiatG/pl/WiatG.pl. A part from this, I was occupied with standard SEE-GRID operational activities. Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- - Documentation regarding configuration of tomcat DN base authentication for SAM programmatic web interface https://twiki.cern.ch/twiki/bin/view/LCG/SAMDevelopmentTomcatSSLIntegrationAndDNBasedAuthentication - WiatG presentation at OPS meeting http://indico.cern.ch/conferenceDisplay.py?confId=18897 - SAM supporter for two weeks (July 2-6, July 16-20) Most of the time I spent working as SAM supporter. A part from this, I wrote documentation regarding configuration of Tomcat DN base authentication for SAM programmatic web interface (https://twiki.cern.ch/twiki/bin/view/LCG/SAMDevelopmentTomcatSSLIntegrationAndDNBasedAuthentication). Also, I prepared a presentation on WiatG tool and performed it at OPS meeting (http://indico.cern.ch/conferenceDisplay.py?confId=18897). Major events attended (include links to event/presentation) --------------------- - WLCG-OSG-EGEE Operations meeting (July 30) - SAM weekly meetings - IT-GD-OPS weekly meetings Beside weekly SAM and IT-GS-OPS meetings I attended WLCG-OSG-EGEE Operations meeting on July 30. Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- For the next month I have in plan to attend SEE-GRID PSC meeting which will be held in Thessaloníki. Holidays during the period ------------------------------------------------------------ No holidays TimeSheet for the month ------------------------------------------------------------ WP3 A3.1 90% WP1 A1.4 10% Infrastructure status ------------------------------------------------------------ 30 of sites in project 12 of sites contributing to the EGEE production infrastructure 1054 of cpus 24TB total SE
    • 09:00 09:20
      Florida Estrella 20m
      EUCHINAGRID Review contract amendment, corrections sent to Federico, file sent to Frederic Upload review docs in EDMS https://edms.cern.ch/cedar/plsql/doc.info?cookie=6633455&document_id=855340&version=1 Upload EC Financial Assessment report for P1 https://edms.cern.ch/cedar/plsql/doc.info?cookie=6633455&document_id=855367&version=1 Contribution to the 6th QR, including ASGC (third party), see https://edms.cern.ch/file/856044/1/EUChinaGrid_CERN_6QR.doc Sent EUchinaGrid2 first draft to BJ, FH, RF, with short summary. Resent LoI request as well. BalticGrid Reminder Rolandas that BG 3AHM trip report is not ok! Upload DoWII in DFS, EDMS, waiting for Per to send the file Upload EC Financial Assessment report for P1 in DFS, EDMS, waiting for Inger to send the official file https://edms.cern.ch/cedar/plsql/doc.info?cookie=6633710&document_id=855373&version=1 Participate PMB 076 Participate PMB 077 09.07 Participage BG4Science proposal meeting 09.07 minutes http://indico.cern.ch/conferenceDisplay.py?confId=18674 2nd period pre financing confirmation. Sent to Zofia a copy of the EGEE movie for the planned BG Movie SEE-GRID-2 Minor comments on D31b https://edms.cern.ch/file/856515/1/SEEGRID2-WP3-CH-002-Deliverable3.1b-f-2007-06-29.doc Confirmation participation in SEEGRID2 PSC in Thessaloniki, Dusan attending PSC, not industry day Review outcome of SG2 1st review official report, summary sent to xxx Negotiations docs received, recalculation of effort/budget. OKed with FH. Booking Vudragovic to Thessaloniki sent to IT sect Health-e-Child Training report compiled http://indico.cern.ch/getFile.py/access?resId=0&materialId=0&confId=17132 2nd year prefinancing discussion Update CERN information in the project monitoring and reporting tool (PNB) DoWII (internal & public) uploaded in EDMS https://edms.cern.ch/cedar/plsql/doc.info?cookie=6633455&document_id=761447&version=1 Upload EC Financial Assessment report for P1 in DFS, EDMS, waiting for Joerg to send the file Participation in the H-e-C project meeting, EB, GB, PMT, trip report <<>> Preliminary review of D6.x, comments sent to TH, DR, AB Preliminary review of D14.1 EGEE license s/w sent to Joerg, Edwin https://twiki.cern.ch/twiki/bin/view/EGEE/EGEEgLiteSoftwareLicense HeC IPR budget clarification, waiting for FH to confirm. EELA Intermediate Form C due 20 Jul, ok with Dita Upload EC Financial Assessment report for P1 in DFS, EDMS, waiting for Felix to send the file (currently not available, probs with some Form Cs) RPLO EGEE07 support - soliciting session requests, specific support for H-e-C/HealthGrid workshop RP Database support - information for EGEE-III (active projects during EGEE-III) Add Auvergrid to the RP database, request for info sent to Vincent, Yannick EUMEDGRID Upload review docs in EDMS https://edms.cern.ch/cedar/plsql/doc.info?cookie=6633455&document_id=855341&version=1 Upload EC Financial Assessment report for P1 in DFS, EDMS, waiting for Marta to send the file Consolidation of updated D22 see <link> Todo: Review EUMEDGRID proposal doc sent by F Ruggieri 10.07 Contribution to the 6th QR see https://edms.cern.ch/file/856040/1/EUMedGrid_CERN_6QR.doc Review 6th QR, file \Departments\IT\Projects\FP6\Projects\EGEE\EUProposals_march2005\EUMedGRID\Activity_Documents\QR\6\EUMEDGRID-QR6-V0-1 Review EUMED updated budget plan at G:\Departments\IT\Projects\FP6\Projects\EGEE\EUProposals_march2005\EUMedGRID\Activity_Documents\Finance&Audit\UpdatedP2\ EUMEDGRID-UpdatedBudgetPlan-V1-1.doc <<-ok, file checked, budget & effort correct EGEE2 Newsletter review EGEE-III RP descriptions ** add ts, fin, rep done
    • 09:20 09:40
      Domenico Vicinanza 20m
      Domenico Vicinanza July, 2007 Major work for EUMEDGRID; major changes in workplan ---------------------------------------------------------------- - SAM Server maintainance: -- Oracle XE database maintenance (upgraded the latest version of SAM db scripts) -- Database tables recreated -- Restarted the syncronization with the BDII - Working together within WP3 on the integration between SAM infrastructure and EUMDGRID support service. -- two tools (shell scripts) have been prepared to retrieve and organize test information from the project SAM installation and alert site managers sending them emails and/or SMS when a system fails because of a critical test failure. Both of two just need a configured and working SAM client, they are immediately working after a really easy configuration. The first one generates a formatted HTML the second one allows to send email and/or sms to the sitemanager when a site is failing some critical SAM test -- an integration procedure is going to be designed to make this second script able to interact with EUMEDGRID support system to raise tickets to the sitemanagers (ALICE vo is also testing these two scripts, customized to work displaying and alerting site admins just for the VOBOX tests failures) -- a tool monitoring SE disk space (displaying it as a pie chart) has been finalized and integrated together with the SE SAM results in a dynamically generated webpage. Results availble here: http://cern.ch/eumeddiskspace - Finished CMSSW installation and testing guide which has been released both in PDF (http://cern.ch/vicinanz/files/cmsswinstallation.pdf) and HTML (http://cern.ch/vicinanz/cmssweumed) - Support to EUMED siteadmins to help fixing site configuration problems to install CMSSW software - Pilot installation of CMSSW software on some test sites - Worked on the updated version of the Deliverable 2.2. EU asked CERN (as responsible for the related Action 2.2) to resubmit it with updated results and with some more details about interaction among WP2 and the Infrastructure and Application WPs (WP3 and WP4) - Contributed to Chapter 7 of the EGEE deliverable DSA1.5 "The Infrastructure Planning Guide" (the Cook-book) Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- - SAM Test integration: -- continued ATLAS Experiment test integration: preparation of a testing environment to allow ATLAS people to safely launch tests and publish results on a development database -- Customized for ALICE VO a tool developed for EUMEDGRID to send emails and/or SMS to sites responsibles when failing critical tests. This was then requested by other experiments (LCHb is the next one). (To do: customize the frequency between the alarms (1/day, 1/week) depending on some factors) -- Following up integration of LHCb tests (basically complex tests doing software installation/validation): test have been rewritten to create SAM-compatible output files, they are submitted within DIRAC and result published by SAM publishing framework on the validation database - SAM Documentation: -- Working on SAM server installation guide for SLC4. Major events attended (include links to event/presentation) ---------------------------------------------------------------- - Presented at the IT-GD-OPS section meeting about HPDC conference highlights: http://indico.cern.ch/conferenceDisplay.py?confId=18766 - SAM Team and IT-GD-OPS weekly meetings Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------ Holidays during the period ------------------------------------------------------------ 0 day TimeSheet for the month ------------------------------------------------------------ WP3/A3.2 and 3.3 70% WP4/A4.2 and 4.3 30% Infrastructure status ------------------------------------------------------------ # of sites in project: 12 (10 Countries, 8 Mediterranean Countries) # of sites contributing to the EGEE production infrastructure: 5 # of CPUs: 724 (120 CPUs are in gLite CEs) total SE: 9 total CE: 12 total gCE: 9 total RB: 6 total gRB: 2 total FTS: 0 total LFC: 1 total Local LFC: 0 ************************************************************
    • 09:40 10:00
      Marc Ozonne 20m
      ICEAGE * ISSGC07 Updated and added exercises for the gLite Practicals Gave support during the gLite session and to the school in general Gave a presentation (25') about the gLite Data Management servises * CSC07 Updated the grid track practicals GRID IN A BOX * Supervision of the Open Lab student, Paulo Ricardo Motta Gomes, who is working on this project for 2 months. * Meeting with Omer Khalid (SA3) and Paulo about the use of VGrid Portal in this project OTHER Presentation of the Grid Operations by Florida Meeting with Erwin HOLIDAY Monday 30th
    • 10:00 10:20
      Rolandas Naujikas 20m
      Rolandas Naujikas 07, 2007 Major work for BalticGrid; major changes in workplan ---------------------------------------------------------------- SAM maintenance. Added SGI supercomputer (64 CPUs) to VU-MIF-LCG2. Improvements of GAMESS software installation. Major rework of MONBOX configuration at VU-MIF-LCG2. Analysis of APEL accounting problems at VU-MIF-LCG2. glite-CE grid5.mif.vu.lt removed from production. Major work for CERN; major changes in workplan ---------------------------------------------------------------- Upgrades in CERN_PPS. Major issues arising -------------------- FCR tool is not yet released - managing exclude file by hand. 2 sites (SU-LCG2, VGTU-gLite) suspended from production temporary. Major events attended (include links to event/presentation) --------------------- Summer school in Riga on 4-6 July. Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- None Holidays during the period ------------------------------------------------------------ None TimeSheet for the month ------------------------------------------------------------ NA2: 0% NA3: 0% SA1: Task2: Core central grid services: 10% Task5: User support system: 30% Task7: Logging and accounting system: 30% Task8: Validation and certification of production sites: 30% Infrastructure status ------------------------------------------------------------ 26 sites in project 12 sites contributing to the EGEE production infrastructure 959 cpus (average) 33TB of SE
    • 10:20 10:40
      Lanxin Ma 20m
      document
      Lanxin Ma July. 2007 Major work for ; major changes in workplan ---------------------------------------------------------------- 1. Finished CMS SW application remote installation report and the form CMS SW deployment status in EUChina sites. 2. provided CMS SW deployment status form in EUChina infrastructure and what CERN contributed in CMS SW deployment to D4.3 3. Started certifying EUChina new site SDU-LCG2 in EUChina infrastructure and in dteam vo 4. Inform EUChina ROC about an EUChina RB(lcg005.ihep.ac.cn) in IHEP and push IHEP to publish the RB to all pertners 6. infrastructure trubelshooting:investicate & solve EUChina sites problem CA update in BEijing-cnic CE in Beijing-lcg2 SE in infn-catania 7. helped to solve EUChina SAM monitoring configuration problem in dteam vo fixed EUChina WebUI access SSL problem fixed the sync problem between euchina top BDII and EUChina SAM that caused the new site sdu-lcg2 was missing in EUChina SAM 8. Finished filling in "2007 part" of the EUChinaGrid infrastructure & evolution taken from Gstat, GridICE etc. disscussing with EUChina technical leader if we ask all partners to fill other parts. 9. Process EUChina tickets 10. contribute to Chapter 7 of the EGEE deliverable DSA1.5 "The Infrastructure Planning Guide" (the Cook-book) Major work for ; major changes in workplan --------------------------------------------------------------- 1. VOMRS maintenance & troubleshooting in LCG production server 2. VOMRS user support, Process user's requests, problems & tickets 3. Due to oracle security patch, Tested vomrs-1.3-0 whether work properly with the patched oracle DB and wrote test report, the test environment is same with the current production. The test report in https://twiki.cern.ch/twiki/bin/view/Main/VOMSTesting 4. VOMRS-1.3-1 auto-testing by running test scripts due to fixed a bug reported by DESY 4. started preparing to certify vomrs-1.3-1 with tomcat5.5(new version) 5. Created a new SAM submission chain in order to support CERN ROC and SAMAP - A top BDII is deployed using CNAF default site list file which contains PROD/PPS Certified/Uncertified sites https://twiki.cern.ch/twiki/bin/view/LCG/ROCTopBDIIConf - A WMS+LB server is deployed and configured with the new top BDII - The latest pps glite UI 3.1 with SLC4 is deployed and confirured with the new top BDII and the new WMS+LB - A SAM client is established using customized configuration files - new SAM submission chain (WMS-BDII-UI-SAM Client) up and running - regular submission on behalf of 'dteam' to PPS/PROD Certified/Uncertified sites in CERN ROC - the documentation available in https://twiki.cern.ch/twiki/bin/view/LCG/CERNROCSamInstallationNew 6. manange and mataince this new SAM submission chain 7. submited a yaim bug https://savannah.cern.ch/bugs/?27769 8. PPS top level BDII maintance & weekly PPS_upgrade Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- IT-GD-OPS weekly meeting Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 0 days TimeSheet for the month ------------------------------------------------------------ WP3/A3.3 90% wp4/a4.1 10% Infrastructure status ------------------------------------------------------------ 11 of sites in project 11 of sites contributing to the EGEE production infrastructure 1667 of total cpus (Gstat) total SE: 12 total CE: 11 total RB: 7 total FTS: 0 total LFC: 1 total Local LFC: 1 total GridICE: 11 ************************************************************
    • 10:40 11:00
      Alexandre Duarte 20m
      Alexandre Duarte July, 2007 Major work for EELA; major changes in workplan ---------------------------------------------------------------- * SAM Maintenance * Developed of a new version of the SAM Google maps interface, combining the results of two different VOs (https://sam.eu-eela.org/full.html) * EELA Grid Operation * Certification of two new EELA sites: UFCG and CBPF * Writing the presentations about CIC on Duty and ROC on Duty for the WP2 Workshop * Re-writing JRA1 for the new EELA 2 proposal Major work for GD-OPS major changes in workplan ---------------------------------------------------------------- * ROC on Duty ( from the 16th to the 20th of July) * ROC on Duty ( from the 23rd to the 27th of July) * Working on the Certification of the McGill University site. * Working on the Certification of the UFRJ site. * Finished the refactoring the bdii2oracle.py script Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- Weekly SAM Team Meetings and Section Meetings EGEE WLCG-OSG-EGEE Operations Meetings (16th and 23rd of July) Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- WP2 Workshop from 20 to 24th of August (http://indico.eu-eela.org/conferenceDisplay.py?confId=104) Holidays during the period ------------------------------------------------------------ 5 days TimeSheet for the month ------------------------------------------------------------ WP2/T2.1 40% WP2/T2.3.1 30% WP2/T2.3.2 30% Wp4/T4.2: 0% Infrastructure status ------------------------------------------------------------ # of sites in project - 16 # of cpus - 1668 total SE 62.5 TB ************************************************************
    • 11:00 12:00
      Konstantin Skaburskas
      Konstantin Skaburskas July, 2007, month 19 Major work for Health-e-Child; major changes in workplan ---------------------------------------------------------------- WP5/T5.2 00% (1-9 M) (13-30 M) - WP5/T5.6 10% (13-30 M) - gLite security patch for DPM-gridftp-server on 3 HeC sites - U27 (staged upgrade of BDII) on all HeC infra - “TIER-*” problem on HeC. YAIM takes into account only 1..9 tiers. If in site-info.def SITE_TIER=0 then static ldif for the site contains “GlueSiteOtherInfo: TIER-”. This makes SAM unhappy. Was changed on CERN1-Geneva-CH, CERN2-Geneva-CH, SIEMENS1-Erlangen-DE, IGG1-Genova-IT. - debugging HeC SAM instance. problems with web interface. - continuing to work on deliverable WP5 D5.1 - found a problem with publishing LFC static information (missed “AccessControlRule” for HeC ops VO). Solved. - SAM submission for LFC is failing. Contacted David Collados. Problem is with Oracle trigger. - discussed with David Collados SAM programmatic interface. - migrating SAM to new server (at Maat, CERN) WP5/T5.7 00% (18-30 M) - WP5/T5.8 00% (18-30 M) - WP5/T5.9 00% (13-30 M) - WP5 Deliverable 5.1 - 55% (M 18) “Report on the delivered prototype Grid Platform (PDI and grid interfaces to gLite services)” WP14/T14.1 00% (13-30 M) - WP14/T14.2 30% (13-30 M) - PROD site IGG1-Genova-IT: installed/configured gLite CE+WN/DPM - CE tested. Job submission is not possible from WMS because IP->hostname resolution is not working yet. Reported to Maat. - DPM tested - works - fixed MySQL connection problem for DPM info user. Now DPM info-provider publishes correct information on storage space usage for IGG DPM. Reported to Maat. WP14/T14.5 00% (18-30 M) - WP14/T14.6 00% (18-30 M) - WP14/T14.7 00% (18-30 M) WP14 Deliverable 14.1 - 05% (M 18) “Report on the status of the Platform deployment in PP and PROD environments” Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- - OPS: * BNL requested new CERN-BNL SRMv2 channels in FTS * helping Lanxin with new instance of WMS for SAMAP * helped Farida with configuration/testing of Role=lcgadmin on PPS CEs * tested lcg-CA 1-15 release * solved a problem with gridftp denied ids list on WMS for Lanxin * helped to debug MyProxy server related problem on FTS instance at CNAF - SAM: * solved bug #27687 * working on bug #24685 Major issues arising -------------------- - Major events attended (include links to event/presentation) --------------------- - Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- - Holidays during the period ------------------------------------------------------------ * days 0 *TimeSheet for the month *19* ------------------------------------------------------------ WP5/T5.1 --% (1-6 M) DoWI WP5/T5.2 00% (1-9 M) (13-30 M) WP5/T5.3 --% (7-12 M) DoWI WP5/T5.4 --% (10-15 M) DoWI WP5/T5.5 --% (16-18 M) DoWI WP5/T5.6 10% (13-30 M) WP5/T5.7 00% (18-30 M) WP5/T5.8 00% (18-30 M) WP5/T5.9 00% (13-30 M) -- WP5 D5.1 55% (M 18) WP14/T14.1 00% (13-30 M) WP14/T14.2 30% (13-30 M) WP14/T14.3 --% (18-30 M) CERN 0% WP14/T14.4 --% (13-30 M) CERN 0% WP14/T14.5 00% (18-30 M) WP14/T14.6 00% (18-30 M) WP14/T14.7 00% (18-30 M) WP14/T14.8 --% (18-30 M) CERN 0% WP14/T14.9 --% (18-30 M) CERN 0% -- WP14 D14.1 05% (M 18)