WP5.2 Technical Meeting

Europe/Zurich
Description
Zoom Meeting ID
62065108348
Host
Emil Kaijanen
Useful links
Join via phone
Zoom URL
    • 11:00 11:05
      Minutes of last meeting 5m
    • 11:05 11:20
      Announcements 15m
      • CERN CINEL management meeting on 1st and 2nd July.
      • Purchase order for Staubli latches (presentation at previous meeting) has been sent.
      • VSC delivered 4 drift tubes instead on 5. We need visibility on the delivery of the 5th one.
      • Need of a geometrical assessment of the TCTPXV drift tubes already delivered (Action for STI).
      • F.-X. Nuiry sent an email to Alexandros and Jorge on the 7/07 at 11h51 with a list of questions and the request to upload their last slides about the structural assessment onto the agenda of the 29/06 meeting.
      • VSC completed the UHV assessment of the 4 x LHCTCTPXV_0123 + 4 x LHCTCTPXV_0121. All OK. Need report.

      Among them:
      -> 1 x LHCTCTPXV_0123 + 3 x LHCTCTPXV_0121 are OK.
      -> 3 x LHCTCTPXV_0123 + 1 x LHCTCTPXV_0121 present geometrical defects: At least two or more fingers are overlapping, probably due to the weld difference of heating, along the circumference.

      Decisions:
      a. 1x valid LHCTCTPXV_0123 is kept at CERN for installation on the TCTPXV pre-series.
      b. 7 other parts are sent back to CINEL for actual test with LHCTCTPXV_0131, in view of assessing if 3 x LHCTCTPXV_0123 + 1 x LHCTCTPXV_0121 shall be re-produced or not.

    • 11:20 11:35
      TCLM prototype thermal testing and results 15m
      Speaker: Mr Edouard Grenier-Boley (CERN)
    • 11:35 11:50
      Any other business 15m
      • Tank machining with cutting fluid Rhenus TU446