BOND design status - General update

Europe/Zurich
927/1-B23 (CERN)

927/1-B23

CERN

35
Show room on map
Zoom Meeting ID
64743461277
Host
Jose Ferradas Troitino
Useful links
Join via phone
Zoom URL
  • Open for ideas on BOND logo
  • Jose presented the FE results on the new pole design. Results are almost the same of the original pole. Nico P. already implemented this change.
  • Vendela is compiling the results on the new yoke geometry. To be presented in one of next meetings.
  • Nico L. presented the results on the DIC measurements. Everything is consistent with our previous measurements and expected behavior.

 

 

Racetrack coil mock-up:

  • Racetrack wound completely this morning.
  • The mock-up will be ready for installation on DIC system on Friday
    • We already checked with the guys from the oven. Also if we could adjust manually the plateaus if needed (It can be done but needs to be there in person).
  • For the pole constraints, we will link each of the poles to the baseplate trying to simulate the flared end configuration.
  • Simon Hopkins provided feedback on the reaction heat treatment to be used (conductor is RRP low-grade)
    • We will go for a standard MQXF cycle.

 

CAD update:

  • Poles pinned together as one entity (Ti pins).
  • Filler in the aperture will not be screwed. It will be "free" and machined to have a good contact with the pole.
  • Nico P. to prepare a list on the pole holes.
  • Drawings (coil - winding - reaction) for the end of the month.
  • Then 1 month for the impregnation drawings (end of July)
  • We need to speed-up the missing simulations to finish the structure before Matthieu's final date (end of July)
There are minutes attached to this event. Show them.