Determine the rate at which the Canopus emitter on JB8 is waked up to activate a communication from the other Canopus beacons.
14:20
→
14:40
Possible/Optimal positions of TAB2/TAB3 or their substitutes20m
Determine the positions of the silent LBL emitters if they are finally emitting signals. Identify additional locations for their substitutes if it turns out that the visibility of the initial positions is not favorable.
14:40
→
15:00
Measurement of the relative depth of some existing emitters20m
Discuss the procedure (how, what, when) to measure the relative depth of the working emitters already on the field.
15:00
→
15:20
Settings of the new LBL emitters20m
Discuss the list and the settings of the new emitters that will be deployed during the sea operation. It includes the new TAB and possibly some on-anchor or on-JB beacons.