P371 In-Vacuum Scintillator

Europe/Zurich
530/R-030 - BE-EA Conference Room (CERN)

530/R-030 - BE-EA Conference Room

CERN

35
Show room on map
Zoom Meeting ID
65000034886
Host
Laurie Nevay
Useful links
Join via phone
Zoom URL

Present: Laurie, Philippe, Dieter, Vincent, Huagen,

  • Candidate location in T11 between T11.MQNE008 (blue quad) and T11.MBXHF010 (green dipole).
  • Located around S = 9m and experiment around 27m giving 18m for time-of-flight
  • Likely KF 40mm flange to be used in T-shaped vacuum piece
  • Vacuum piece will be ready from CERN ~end of May
  • Installation foreseen during operation in June during best opportunity. Would take 1/2 day.
  • Potentially high rate of 10^7 to 10^8 at this point in the line.
  • Agreed not a SiPM to be used in this area due to radiation. Only conventional PMT.
  • Cables should be prepared for ~25m. HV + Signal.

 

Actions

  • Laurie - basic simulation for S = 9m to predict rate
  • Philippe - 3D model of T-shaped piece to give to P371 team

 

Will meet on Friday 20th to rediscuss.

There are minutes attached to this event. Show them.
    • 15:00 15:20
      Discussion 20m
      • proposed location in T11
      • proposed connection we will make
      • blank and connection for scintillator
      • confirm which cables will be needed
      Speakers: Dieter Josef Grzonka (Forschungszentrum Juelich GmbH (DE)), Huagen Xu, Huagen Xu (GSI - Helmholtzzentrum fur Schwerionenforschung GmbH (DE)), Laurie Nevay (CERN), Philippe Boisseaux-Bourgeois (CERN), Vincent Johannes Verhoeven (Ruhr-Universitaet Bochum (DE)), Vincent Johannes Verhoeven

      KF40 blank flange, stainless steel 304.

      https://www.allectra.com/products/431-kf40-b/

       

      Position proposed, between T11.MQNEG008=157 and T11.MBXHF010 :

      https://panoramas.cern.ch/viewer?fov=90.00&id=56913956&lat=23.93&lon=209.93