Gas systems project

Europe/Zurich
Beatrice Mandelli (CERN)

GAS M&O meeting 22 January 2021

Present: Beatrice, Roberto, Fred, Patrick, LPh, Kacper, Michal, Gianluca, Mara, Fabio

 

ALICE #3075

TPC

To remember:

  • To remove filter in purifier column

From previous meeting (05/10)

  • Krohne: only present one readying for the full system (distribution is just one channel) —> Leonardo gave to Michal the formula (15/10) —> Michal to implement
  • To do fine tuning of pump

TRD

  • check of Xe recuperation on-going: to involve Gianluca
    • different logic wrt logo: in the stand-by pump in logo always ON, with new software not
    • to check if by leaving pump ON all time, recuperation would be better
  • T sensor not present in the pump: LPh to check if we can add
  • buffer pressure limit changed by piquet (Kacper): LPh to check

To remember:

  • H2O now it is better (even if still a bit higher, purifier material not changed) to keep checking
  • CO2 didn’t open in mixer: why? —> to check, maybe a leak in Tescom?
  • problem of noise in the read-out of Krohne to investigate
  • Brown bottle to fill: tested in another bottle and from the test we know now that it has to be done all manual --> LPh to check with Chilo when to do
  • disk de rupture: they work —> LPh has to contact the safety

HMP

From previous meeting (03/08):

  • Distribution rack in alarm —> LPh to check

MTR

  • pressure sensor on the chamber not present: LPh to check with Martino and then order the sensor (ATEX)
  • to connect dummy chamber electrically —> LPh
  • new software with dummy chamber to discuss —> Michal/Gianluca

From previous meeting (20/11)

  • purifier detection head see something: LPh closed the Ar/H2 line: to check with safety if now it is ok
    • UPDATE: no change of pressure after one month —> no leak

To remember

  • leak test and maintenance in the distribution —> LPh/Leonardo
  • No dummy chamber present in software —> Michal

TOF

  • pump membrane changed

MCH

  • to restart the system next week

To remember:

  • still some work in PID tuning
  • Maintenance of distribution to do: to check with TOF people if we can do

OTHER

To remember:

  • Analysis chain 3 on, to add calibration line

 

ATLAS #3074

MDT

  • rack 73: it seems problem is back: to change motherboard and/or ELMB. One at the time
  • some alarms received for some pressure sensors by piquet —> reset to do
    • to also check grounding
  • after power-cut, problem in MFC1109: I/O error. After reset, MFC back to normal operation

To remember:

  • problem in one VAISALA reading but it is not the sensor —> to investigate
  • regulation valve material to buy asap —> Kacper

From previous meeting (20/05):

  • Reset of pressure sensors giving problem (elog #2489)
    • To check the grounding

RPC

  • one cable UX-US damaged: Patrick to give to Kacper the reference. Also to check status of other cables
  • Leak test on-going for Purifier 2 and 3
  • Leak test on-going for buffer of the exhaust

To remember:

  • maintenance purifier: leaks found
    • Purifier 1: leak on the bottom: it needs to be empty —> next year
  • Leonardo to update maintenance procedure

From previous meeting (13/10)

  • Still some electrical problems:
    • pump regulation valve not working correctly: to replace electrical part —> Beatrice to propose a date
    • to test all cables UX-US

TFC

  • stop caused by a spike in pressure sensor in C-side distribution: not yet clear why it happened

From previous meeting (23/10)

  • Krohne new formula prepared by Leonardo —> Michal to implement
  • Krone exhaust not working properly: to check if it is the krohne or our electrical part. Patrick to try to check the electrical part
  • Kacper to check for regeneration of purifier material

MM

  • analysis module installation on-going
  • detection head installed but IR not ordered yet: Beatrice to check with Paolo if they want to order

ID

  • Ar connected as permanent supply for ID gas back-up

PGS

  • CO2 alarms received due to planned intervention: elog to be done

 

CMS #3071

RPC

  • rack 61, 65, 79 and 83 started. 83 with econex at 15mm2
  • still difference between MFC iC4H10 and reading of 2 IRs and GC (now we are running at ~200 l/h)
    • LPh to check IR with calibration bottle
  • Regulation of flows in dummy chamber done
  • Dummy chamber pressure sensors very sensitive to change of flow: dummy chambers must have volume exchange very similar to the chamber
    • Now chamber volumes are wrong —> Mara to check with Michal

To remember:

  • difficult to reach 1000 l/h. Only possible with one MFC: Kacper/Fabio to check the other MFC
  • 200 l/h is very low wrt the MFC range, so probably we have a big error: to think to buy a set of MFC for lower flows —> Beatrice/Mara

CSC

  • purifier columns temperature now ok

To remember to do

  • need to do purifier maintenance (and change festo block which is leaking): to discuss but for sure after February Run
  • Found leak in safety valve of purifier (~800 ppm): to replace next year
  • To put scale sticker on all bubblers —> Andrea

DT

  • hygrometer YB-1 replaced
    • broken to be sent to the company
    • Added alarms by Mara on H2O concentration

To remember

  • Still problem of buffer pressure decreasing when the system stops —> to investigate
  • MFC calibration postponed to beginning of next year
  • Profibus cable has to be change: need to stop the system —> next year

 

 

LHCb #3073

RICH1

  • need to change membrane of pump 1

From previous meeting (13/11):

  • probably new leak appear (elog #2900): Patrick closed the exhaust (valve after zimmerli): why it was open?

RICH2

  • still some work to do, list presented by Patrick

To remember

  • strange PID for RICH2 (Kc=25, Ti=20): they were changed on 03/06 at 2pm —> Why?
    • can we go back to old values —> Mara to check with Michal for the logic
  • PT5005 changed but still spikes visible: to think about
  • problem of high injection of CO2 from the mixer
    • probably due to purifier (leak in column A + not saturated in CO2)
    • leak already present in 2018 (elog #2886)

ANALYSIS CHAIN 3

From previous meeting:

  • probably a leak in the electro-valve of Ar-100 ppm H2O —> to change electrovalve
  • new Ar-100 ppm H2O to connect

MWPC

  • Differential pressure sensor  DPT4020 installed

 

NON-LHC

  • Warning in LINAC 4 Building 400 —> Roberto to check

 

SOFTWARE

  • New idea to divide alarms in:
  • Profibus/canbus monitoring: Michal shows where we have and where it could be useful to have (based on history of problems in the past). To discuss if regeneration of code is worst for these system

From previous meeting

  • New feature for alarm when system is OFF: to provide to Michal the list of alarms we want to have when system are OFF —> Mara/Gianluca with experiment technical responsible by week 5

 

PIQUET

 

GENERAL

  • Presentation by Fred of the moving of workshop from 155 to 108-164
    • Timeline not yet clear: maybe this summer. Roberto said that this summer is too early given the work in the workshop
    • New piping needed: Beatrice proposed to check with external company
    • What about the possibility to move LPh lab (now at 256) and MFC calibration station in new workshop? Fred to check

From previous meeting

  • To fix the StepWS problem asap otherwise difficult to have history in case of problems —> Michal/Gianluca
  • MFC exhaust problem: software or hardware —> Roberto to try with CMS CSC and Michal to investigate
    • CMS DT problem in Exhaust MFC: if you put open it goes in error and you have to disconnect
    • Everybody to check that range of MFC in software is the same of hardware
  • Aging test priority
    • To do: Electrovalve dirty and cleaned of analysis, Vogtlin flowmeter, IR BINOS (they do aging —> LPh to check for modification)

 

 

 

There are minutes attached to this event. Show them.
    • 14:00 14:05
      Piquet interventions 5m

      http://eloggas.cern.ch/GAS_PIQUET/

      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Kacper Jerzy Kapusniak (CERN), Michal Zbigniew Zimny (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR))
    • 14:05 14:15
      M&O and project organization 10m
      Speakers: Beatrice Mandelli (CERN), Roberto Guida (CERN)
    • 14:15 14:25
      Overview of planning LS2 10m
      Speaker: Beatrice Mandelli (CERN)
    • 14:25 14:30
    • 14:30 14:50
      Plan of LS2 activities 20m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN), Roberto Guida (CERN)
    • 14:50 16:15
      Gas systems for the LHC experiments
      • 15:05
        ALICE 5m
        Speakers: Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Louis-Philippe De Menezes (CERN)
      • 15:10
        ATLAS 5m
        Speakers: Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Kacper Jerzy Kapusniak (CERN)
      • 15:15
        CMS 5m
        Speakers: Andrea D'Auria (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 15:20
        LHCb 5m
        Speakers: Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Patrick Carrie (CERN)
      • 15:25
        Not-LHC experiments 5m
        Speaker: Fabio Bordon (CERN)

        https://eloggas.web.cern.ch/Non-LHC+Experiments/463

      • 15:30
        Software 10m
        Speakers: Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Michal Zbigniew Zimny (CERN)

        From https://readthedocs.web.cern.ch/display/GCSD/2021-01-15+Meeting+notes

        • MZ or BM to provide the list of the gas systems to be upgraded (Alice MTR) with Dummy Chamber) 
        • GT to check with Lukasz where this new project NA61 
        • ND280 (test machine of EP-DT-FS 
        • GT Data Analytics to re-start activities
        • GT to check which SMS category can be used to be notified in case of power cut (PLCs)  (i.e. last power cut that happened in CMS on 07/01/2021)

        22.01.2021:

        • Which priority systems to include profibus monitoring
          • systems with major issues:
            • LHCb MWP (canbus)
            • CMS CSC (profibus)
            • CMS DT (canbus/profibus)
            • CMS RPC (canbus)
            • ALICE TPC (profibus) - already implemented
            • ATLAS MDT (canbus/profibus)
            • ATLAS TGC (canbus)
          • systems with profibus canbus monitoring already implemented:
            • ATLAS MMG
            • ATLAS RPC
            • ATLAS AUX
            • ALICE TPC
            • LHCb RI2
            • LHCb RI1 (will be implemented together with PLC replacement)
            • CMS AUX  (will be implemented together with PLC replacement)
            • CMS CF4Recovery (will be implemented together with PLC replacement)

         

        • unCriticalAlarms e group created for each experiment- list of the alarms that should be always checked(example ALICE HMP backup pressure alarm) to be defined (JIRA:GCSSCD-204)
        • ALICE TPC pump - valve regulation PID tuning (to keep in mind that still needs to be done)
        • ALICE TRD Pump -  pump temperature sensors - will they be installed?
        • PGS - overview panel for PGS supply created with dewar alarm added on the panel for better indication of situation when gas is not supplied from dewar - new version available on ATLAS PGC
      • 15:40
        Gas web-page 5m

        http://test-gasmonitoring.web.cern.ch
        https://ep-dt-gasanalysis.web.cern.ch

        Speaker: Beatrice Mandelli (CERN)
      • 15:45
        Gas analysis: standard H2O/O2 5m
        Speaker: Louis-Philippe De Menezes (CERN)
    • 16:15 17:05
      Gas System developments
      • 16:15
        Gas System Test-Bench 10m
        Speaker: Fabio Bordon (CERN)
      • 16:25
        CMS CF4 recovery 10m
        Speakers: Fabio Bordon (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 16:35
        LHCb RICH2 CF4 recuperation 10m
        Speaker: Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 16:45
        R134a Recuperation 10m
        Speakers: Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Ian Crotty (University of Wisconsin Madison (US)), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 16:55
        AoB 10m
        Speakers: Fabio Bordon (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Leonardo Nesti (Universita Di Bologna (IT)), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
    • 17:05 17:15
      FSU & Jobs status 10m
      Speaker: Frederic Merlet (CERN)
    • 17:15 17:25
      AoB 10m
      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Roberto Guida (CERN)