Choose timezone
Your profile timezone:
From my side, two points
- Chariot that holds the cavity as had its wheels replaced as there was an issue with the weight - Chariot now OK ( see attached image)
- Awaiting OK from workshop that the cavity frame modifications are agreed and done, so that we can have pieces transported to SM18 for an assembly test. Ester should contact Pierre to check in on things.