GIF++ installation and schedule meeting
Remote only
CERN
-
-
11:00
→
11:05
New Announcements 5m
IMPACT Declarations 2021 :
For 2021, please prepare a new request, with "GIF - Irradiation 2021" as intervention period.
If you clone the one from 2020, please review the description and the participant list !You will need an active IMPACT to activate the DCM and enter the bunker.
List of active IMPACTS : PPE154Please update the label on your setup. (Needs to start with 16xx)
----------------------------------CALL for Muon Beam Time :
See dedicated agenda point.
----------------------------------F-Gas Inventory - EP :
Usage at large experiments known.
In case you use F-gas in your lab for small setups or R&D - please contact Roberto Guida !!----------------------------------
Access System Maintenance :
Two days of Access System unavailable.
Proposed : Tue & Wed. 24-(25.02)
----------------------------------
Irradiator Maintenance :
Options : Week 9 - 1 March
Week 18-21 Whole of May----------------------------------
-
11:05
→
11:15
Muon Beam Request 2021 10m
North Area Physics : 12.July to 14.November 2021
All requests for Muon beam time at the GIF++ facility have to be send to
GIFPhysics.Coordinator@cern.ch (Martin)
Deadline : FRIDAY 22.01 !! -
11:15
→
11:30
Weekly planning 15m
WILL BE UPDATED DURING THE MEETING !!!
----------------------------------
Weekly Planning : https://teamup.com/ksvh7dak8mub8k7xpe
UPSTREAM : Default filter settings : 2.2
DOWNSTREAM : Default filter settings : 1----------------------------------
ATLAS - MM :
3 long term chambers placed (on the ceiling), operational.
New detectors coming next week.ATLAS - sTGC : New stand for flushing chambers before testing. Chambers arrived from Chile.
ATLAS - sMDT :
Gas quality will be changed from class II to class III (bottles ordered and expected next week)
REQUEST : 2-3 days at the end of next week running with max filter in upstream (outside sTGC tests)CMS - CSC: Progressing with the activity to resume everything after the long stop.
EP-DT2 : System restarted. The aging test with eco-friendly gas mixture are going well.
CMS-DT: Expected to return to bunker later / next year. INFN still blocking activity outside Italy. Preparing for the shutdown and most probably switch to low gas flow already today or tomorrow.
EcoGas: New detector installed. Restarted. Test campaign resumed using standard mixture (R134a, iso-butane, and SF6).
CMS-RPC: Radiation program resumed on trolley 1. Some impedance problem to solve on the new chambers. Gas kill signal that didn't work when the R134a- FIXED. Proposal to keep 4.6 as default attenuation filter for one week - outside sTGC measurements.
ATLAS-RPC: Coming back for the moment, not before March 2021.
----------Source OFF until Saturday Evening, then restarting with 1 / 4.6 for Sunday. -
11:30
→
11:35
New requests for tests at GIF 5m
introduction, goal of the test, plan, needs
BLM measuring campaign announced / ≈ 100 BLM, 6h approx. Week 45 (November 2nd till Friday 6th ). We will arrange everything in a way that the setup could be installed inside the bunker in the upstream area near ATL-sTGC setup -> postponed until next year
----------------------------------
Bulgaria academy of science -> testing of new type of radiation monitor systemA new setup of ALICE-RPC will come. More news in coming weeks.
Lab on Fiber (LOF) dosimeterGas recuperation system to be installed - Responsible : Roberto
4 additional racks in Gas Service area. One containing flammable gas.
FG detection system to be installed, power needs to be provided.
(DELAYED by a few months. Will be first installed in CMS, and only later come to GIF) -
11:35
→
11:40
Long Term Planning 5m
Gas usage at GIF : we need to compile a table of gas mixture / consumption
Gas training courses : ATEX level 1 and F-Gas training courses.
List of trained people to be collected.- https://lms.cern.ch/ekp/servlet/UNIVERSALSEARCH?ACTION=SEARCH&KEYW=atex
- https://lms.cern.ch/ekp/servlet/ekp?PX=N&TEACHREVIEW=N&PTX=&CID=EKP000039939&TX=FORMAT1&LANGUAGE_TAG=en&DECORATEPAGE=N
Start to check the position of the CMS-DT chamber for the debugging. It would be nice if we can put it, either in the prep. area or beside the fence (near the XTDV motors)
-
11:40
→
11:45
Infrastructure & Upgrades to the Facility 5m
Improvements needed or planned for the facility.
Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)- Yesterday Wednesday 27.01 we had a problem on the access system. A communication fault was detected due to a an error with the concentrator of the H2-H4 beam line. After inspection in BA81 and the technical gallery, the problem was found on the PPE 112. Somehow we lost the electrical power to this PPE and this moved the chain H2-H4 in locked mode, because the system wasn't sure about the state of the chain.
- Upcoming intervention on Access System : controller upgrade. 2 days of work.
Will be organised around a Wednesday (e.g. Tue. & Wed) in the second half of FebruaryMonitoring of primary lines to be done.
Cooling system expected to be back on 15.02.
-
11:45
→
11:50
General Items 5m
-
IMPACTs for 2021 5m
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
- two chambers on individual supports -> 2 IMPACT declarations
- multiple chambers swapped on same or similar support -> one IMPACT declaration
- basically, if you need two locations, please make two IMPACT declaration (clone)
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes). -
CoVid-19 5m
CoVid-19 Risk Assessment for the Facility : https://edms.cern.ch/document/2376286/1
General guideline :
- ONE setup to enter the bunker at any given time.
- All presence at the GIF and access to the bunker needs to be announced via Teamup beforehand (!)
- Traceability of people on site : Logbook ! - List all the people you encountered.
-
- 11:55 → 12:10
-