Actions from previous week:
- Check the availability of a beam pipe to allow the installation of only two CLIC cavity BPM > ongoing
- Further look to solve the noise in the plasma lens pump. > ongoing
- Devise a way of doing laser alignment on the in-air test stand. > done, to be completed for spectrometer line
- Understand where's the end of the trigger cables in the klystron gallery. > to be completed
- Look at moving one of the unused CTF3 front ends to the barrack to aid data collection. > to be verified
- Reconnection of the thermalized water pipes on the X-band ACS > ongoing
- Re-installation of safety valve on gas pipe for P.L. > ongoing, long term