MINUTES
Actions from previous week:
- Check the availability of a beam pipe to allow the installation of only two CLIC cavity BPM --> Stefano is following this up. Long term, the cavity BPM experiment will be done in autumn.
- Devise a way of doing laser alignment on the in-air test stand, spectrometer line. --> Wilfrid is following this up. Parts of the laser yet to be received, system to be installed and tested.
- Look at moving one of the unused CTF3 front ends to the barrack to aid data collection. --> Davide has received no news and will follow it up.
- Reconnection of the thermalised water pipes on the X-band ACS --> Connected, still to be followed up for the temperature control part.
- Re-installation of safety valve on gas pipe for P.L. --> ongoing, long term