2021-CPTE -5 : provisional planning
1. GENERAL NON-LHC TOPIC : Review of NON-LHC planning of Operation [Nicolas .G]
2. CENTRAL AREA : Proposal of electrical powering upgrades for B243/253 and B163 to improve global availability in that area [Thierry .D, Nicolas .G]
3. BA6 : Recurrent cooling water flow issues for 2K pumping systems of BA6 [Ludovic. A, Nicolas .G]
4. HIE ISOLDE : Pressure oscillations in the 4.5K return line and each CM returns [Olivier .P, Juan .C, Nikolaos .T]
Compressed air back up study on going with EN-CV [N. Guillotin]
Work order created to modify the CV102 from NC to NO [WO 29774579]
Budget identification for UPS, compressed air back up, impure gas return line to gasometers
5. SM18 : ? Planification of LINDE intervention during the next SM18 shutdown in January 2022 ?
New purge pump for SM18 infrastructure [Thierry .D, Jean-Paul .L, Nicolas .G]
Flowmeter calibration for B2 to be anticipated
6. A.O.Bs