Color code: (news during the meeting: green, news from this week: blue, news from last week: purple, no news: black)
Event Display Commissioning
- Work ongoing to fix crash with integrated GPU.
- Possible PC model as replacement for ARC ED PC selected.
Problems during operation
- Improvements for memory registration callbacks merged, in FST callbacks are coming immediately. Still need to implement waiting for all callbacks before going to READY state. Implemented by Giulio, tested and merged.
Issues on EPN farm affecting PDP:
- AMD GPUs currently not working on CS8, investigating, for the moment the EPN must stay at CC8.
Issues currently lacking manpower, waiting for a volunteer:
- Tool to "own" the SHM segment and keep it allocated and registered for the GPU. Tested that this works by running a dummy workflow in the same SHM segment in parallel. Need to implement a proper tool, add the GPU registering, add the FMQ feature to reset the segment without recreating it. Proposed to Matthias as a project. Remarks: Might be necessary to clear linux cache before allocation. What do we do with DD-owned unmanaged SHM region? Related issue: what happens if we start multiple async chains in parallel --> Must also guarantee good NUMA pinning.
- For debugging, it would be convenient to have a proper tool that (using FairMQ debug mode) can list all messages currently in the SHM segments, similarly to what I had hacked together for https://alice.its.cern.ch/jira/browse/O2-2108
Workflow repository
- PDP Workflow repository used in first test in global run with TPC today to generate workflow, tests with more detectors will follow this week.
- Waiting for AliECS to implement new fields in the GUI.
- Need new ODC version before we can make the O2 version selectable (currently fixed to the latest)