Speaker
V. Kain
Description
The experience with the injection protection system during the 2010 run will be summarized, the setting-up times and stability will be evaluated. Weak points of the protections system at injection which became apparent with first high intensity experience will be discussed and solutions for 2011 presented if possible. The line between injection quality and injection protection issues will be emphasized and clarifying measures for the involved software tools to be implemented during the shutdown will be presented.