E2A workshop outcome, AD optics and LHC 60 deg lattice
29/09/2021 LNO meeting on E2A workshop outcome, AD optics and LHC 60 deg lattice
Follow up, last meeting:
The discussions and efforts to extend the MAD-X based lattice input description to cover all needs for the Xsuite continue and can be presented and further discussed here in some weeks. A python package to translate deferred expressions exists. The student requests by Ewen (PS) and Laurent for a MAD-NG Python connection will be supported.
News:
Alexander Hauschauer will move in January to OP continuing work of Frank Tecker who is expected to direct CAS from 4/2022. A new ABP LD post mostly related to injector activities should open in 4/2022 and likely another covering FCC and HL-LHC activities later in 2022. It is not yet confirmed but appears likely that RUN3 will be extended by one year.
E2A workshop outcome, Alexander Huschauer, slides
-----------------------------------------
An "Engineering 2 Alignment" kick-off workshop https://indico.cern.ch/event/1061807/ was organized at CERN from 14 - 16 September. Main goals were to better understand the work of the different partners, to improve the overall workflow, and to base the layout database, MAD-X sequence and automatic layout drawings on a single validated reference. Another goal is to better define beam points used for survey and voluntary displacements.
The subject is followed up by a series of E2A meetings. In the E2A meeting today, Riccardo will present a proposal on MAD-X synchronization. The E2A timeline plans for a project definition by the end of this year, followed by a conceptual design and technical implementation phase to be ready for tests during the last RUN3 YETS and full implementation during LS3.
AD optics, Davide Gamba, slides
-------------------------------
Davide started his presentation with an introduction of the Antiproton Decelerator AD and ELENA ring complex, with a collection of links on design reports and other relevant information. The antiprotons are decelerated in several steps from GeV energies down to kinetic energies of 5.3 MeV in AD and 100 keV in ELENA. Both electron cooling and stochastic cooling are used to compensate for the geometrical emittance increase in the deceleration, minimize losses and provide small beam spots for the experiments. The overall cycle length is approximately 2 minutes, providing typically 3.e7 antiprotons per cycle, split to 4.5e6 per user. Measuring and optimizing beam parameters at these low intensities is challenging and time consuming as given by the long cycle length. The emittance can be estimated using scrapers. Suggestions and help on measuring and improving optics are welcome. The AD optics was designed by P.Belochitski and has basically been frozen in 2007.
ELENA was commissioned in 2017-2018. The ring has six 30 degree SBENDs with 17 degree tilted pole faces providing focussing such that beam stability can already be achieved even without powering quadrupoles. Coupling compensation for the cooler solenoids is done with compensation solenoids installed next to the e-cooler and with empirical correction using skew quadrupoles.
There have been proposals to improve the hardware and consolidate instrumentation including providing BPM turn-by-turn data, and there many opportunities for further studies, simulations and improvements, that could result in faster cooling and reduced cycle length.
LHC 60 deg lattice for the 2021 beam test, Jacqueline Keintzel, slides
----------------------------------------------------------------------
The idea to reduce the phase advance per cell in the LHC arcs from 90 degrees to 60 degrees was already considered in the context of studies how to increase the LHC top energy. The 60 degree lattice lowers requirements on quadrupole and sextupole strength. MD-studies using a 60 degree optics could provide novel insights in the LHC lattice and its imperfections. The 60 degree optics has larger dispersion. The momentum compaction factor would be 2x larger, and should allow to determine if the 3% smaller than expected momentum compaction measured at 90 degrees can be explained by imperfect BMP calibration or is a real lattice feature.
The IR optics of the 60 degree lattice are very similar to the standard 90 degree optics in order to minimize consequences for injection, collimation, RF and beam dump. Tune correction and coupling knobs have been generated. Assuring enough beam stay clear at 450 GeV is more difficult than for 90 degrees but expected to remain sufficient.
The optics should be ready to be tested in the upcoming October LHC injection energy beam test and is sent to the collimation and OP teams for validation. Rogelio proposes to contact Riccardo to transfer the 60 degree optics to the optics database to make it generally available. Matteo and Ezio are also to be contacted.
The next meeting is planned in two weeks, shortly before the LHC beam test.