RAL - interlock during TbT SEM meas.

Europe/Zurich
865/1-D17 (CERN)

865/1-D17

CERN

25
Show room on map
Zoom Meeting ID
61024241341
Host
Federico Roncarolo
Useful links
Join via phone
Zoom URL
    • 10:00 11:00
      Discussion 1h

      During the dedicated PS MD on Oct 13th we were not able to insert the PS injection SEM grids (BSG48,52,54) with RAL OUT and BSG-RAL interlock overridden, as expected to be possible, e.g. according to specs approved here: https://edms.cern.ch/document/1832360/1.0

      • Is the problem fully understood to be on the RAL protection layer enabled depending on the ‘user’ ?
      • If yes:
        o When was this protection implemented and who was aware on Oct 13th?
        o why was not evidenced during the HWC in February ?
      • How to safely re-configure the RAL (and BSG if needed) PLCs to enable multi-turn BSG measurements (‘by procedure’ as agreed time ago ) ?
      • Do we have to re-consider other configurations/conditions and re-define the IST and the HWC test sequences to include all scenarios?
      Speakers: Ana Guerrero Ollacarizqueta (CERN), Bettina Mikulec (CERN), Christophe Claude Mitifiot (CERN), Denis Gerard Cotte (CERN), Federico Roncarolo (CERN), Marc Delrieux (CERN), Mario Di Castro (CERN), Matthew Alexander Fraser (CERN), Michel Duraffourg (CERN), Oliver Hans (CERN)