H* weekly meeting
- Status of THz detector quotes: Fredrik awaiting answer from second company. Then we decide.
- Foils have not been received yet
- Lamp has just arrived at CERN. Fredrik will follow up with company about the igniter
- Tim: update on THz simulations to assess effect of bandwidth. There seem to be a problem. Can't recover previous results. Tim is following up
- Need to setup visit with Stephane Detraz. Chloé will organize it. Try to arrange that Fredrik is attending either remote or on site
- Remember to put specific unavailabilities (travel, holidays, conferences etc) on : https://docs.google.com/spreadsheets/d/1-6ds762RNSOIvUw47eBM2Ee3NIf3So4_ep2SvdCgBPE/edit#gid=0
- Adding a new tab to keep track of expenses since the beginning of the year 2022 would be good: Fredrik takes care of it?
- Chloé taking care of GANTT update for H* timeline
- Discussed Maxime plots (attached)
- next step for the beamline
- finish installation electrodes (drill hole on A4 steel or aluminium KF flange for feedthrough)
- contact again Hosidradt asap to get Teflon pinhole orders through (URGENT)
- order KF16 gate valve
- close up and pump over week-end to see how pressure level
- order BMC feedthrough for MCP signal (URGENT)
- depending on lead time for GV, feedthrough etc, install Helmholz coils