Choose timezone
Your profile timezone:
check shipments (Daniel's igniter and JF's filter and hositrad order)
THz powermeters comparison ongoing by Fredrik
Simulations: virtual machine slower. Launch anyway
High rep pulsed deexcitation?
Beamline:
-order Teflon rod from CERN store, Maxime (+ Teflon rings from Hositrad + rings from SMI)
-install gate valve upstream the Teflon ring (find connectors KF16/CF40 + a KF25 feedthrough for electrodes, Fredrik)
-MCP connexions
-coils
do pressure checks with some H flow
periscope
wavemeter is expected in 2 weeks