ERAM Meeting

→ Europe/Zurich
Alain Delbart (Université Paris-Saclay (FR))
    • 11:00 → 11:45
      ERAM status
      • 11:00
        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN)

        Meeting on place with Rui (Alain, Guillaume, David)

        • Status of next production
        • ERAM_29 foil - resistivity mesures on the corner (on corner with 'wrong' value...)
        • ...
      • 11:05
        Mesh pulsing 10m
        Speakers: Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
        • No pulse meshs last week

         

        ERAM_20

      • 11:15
        ERAM gluing 5m
        Speakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))

        ERAM_20 

         

        07/10 : First session  preparation 

        13/10: Gluing ERAM_20

        Time laspe done during gluing session

      • 11:20
        ERAM testing 10m
        Speakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

         

        Last week: ERAM 03

        problem to decrease humidity level (still around 1% after 1.5 days of flush - 17 l/hour)

         

        _____________________________________________

        List of ERAM to be scanned 

        29 in priority

        26 (second round)

        redo 23 because we have two half scans: Planned to be prepared tuesday 23.08.2022

        20 to be pulse meshed again

        https://cernbox.cern.ch/index.php/apps/files/?dir=/__myprojects/t2k-eram/Docs&#office

         

        Modulescan date (french)cards (L/R)commentairepriority order for scans 
        ERAM-0104/03/202281/33 (Keep these cardsdo the scan again because very first old scan ? Same cards6 
            5 
        ERAM-03being scannednew cards (22/55 from ERAM-17 ?)damaged by sparks. Do the scan anyway (to see damaged effect on gain/resol)7 
        ERAM-1318/05/202256/81 --> New cardssame cards as 1 & 2! To be done again with new set of cards2 
            1 
        ERAM-20to be glued and scanned new cards3 
        ERAM-2320/04/202270/63can in 2 halves, to be done again with same cards, to be removed from mock-up first4 

         

         

        the last 400 kOhm one

        11.

        redo 13 because we are not sure we are using the right cards

        redo 17

      • 11:30
        ERAM AOB 15m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))

        Rack de 6 bouteilles livré le 15.07.2022 - (il reste une bouteille pleine pour les tests XRay)

        premier lot de 6 fin juillet: commande OK, rack reçu

        second lot début août: commande OK, rack reçu

         

        Stock actuel au 19.09.2022:

        • 10 bouteilles pleines (individuelles)
        • Lot de 12 bouteilles supplémentaires (connectées ensemble) reçues la semaine dernière pour le banc de test 'Full scan'

         

        • Stock FEC Cards: from Lpnhe on the way, will be delivered at CERN at 182
        • Stock FEM Cards: #10

        - Camera 360: en cours d'installation (test de connexion au réseau cern à poursuivre): Fonctionne localement via un téléphone mobile, quelques difficultée pour le faire reconnaitre sur le réseau cern

        - Stiffners au CERN: 

              actuellement:

            13 stiffners sablés + 4 (à Saclay) => Total de 19 Stiffers

        - Stiffners sablés restant à Saclay: 4

         

        Au cern il reste 2 stiffners non sablés (rapportés de Saclay)