- ROD team status (any points to raise to sites or issues to follow up?)
- Tier-1 update
Operational security
-- Checking results at https://pakiti.egi.eu
Site availability & reliability for December
-- Let Jeremy know of any serious problems with the figures
http://gvdev.cern.ch/GRIDVIEW/downloads/Reports/201012/wlcg/WLCG_Tier2_Dec2010.pdf
Summary from GDB last week
- Agenda: http://indico.cern.ch/conferenceDisplay.py?confId=118230
- EGI-UF 11-15th April; WLCG Workshop, DESY, Late June/Early July; EGI Technical Forum, Lyon, 19-23rd September.
- The 2011 schedule update http://indico.cern.ch/getFile.py/access?contribId=5&resId=2&materialId=slides&confId=115356.
- CREAM status reviewed. Experiments generally seem ready so the request is now for every site to deploy a CREAM CE. A date for the phase out of the LCG-CE was not decided but a timeline of "as soon as possible" was mentioned. Some non-LHC VOs still use the LCG-CE.
- Most of the meeting was used to hear updates from the Data Access and Management Demonstrators. These are now generally well demonstrated and will be taken up within the experiment deployment structures (except for CoralCDN and Cassandra/Fuse as LFC/SRM alternative which are being dropped).