CPTE-2022-2
CERN
1. NON-LHC planning overview for Cryo Operation [Nicolas .G]
2. SM18 upgrade proposal to improve safety aspects in terms of cryogenics operation/maintenance :
- Primary pumps and leak detectors of the CFBs for each horizontal test benches to be installed on the floor instead of on the Passerelle/Plateforme,
- A new signal from the Horizontal Magnets has to be transmitted from TE-MSC to TE-CRG to indicate when electrical tests are ongoing on at least one test bench
- A PV has to be installed on each Vertical test bench to cut the HP Gaseous Helium supply (lock out)
- New signage (signalétique) to be installed close to each Helium exhaust (Safety Valve, Rupture Disk ...)
3. Central Area : B243/B353 (Purifiers area), Status concerning the Helium balloon and its repair
4. North Area : Planning for upgrade and consolidation concerning the new instrumentation for Helium gas management
5. CAST : disassembling of part of the equipment that can be used on other Cryoplants (e.g 2K-pumping system)
6. A.O.Bs / other proposals or needs ?