1. NON-LHC planning overview for Cryo Operation [Nicolas .G]

2. SM18 upgrade proposal to improve safety aspects in terms of cryogenics operation/maintenance :

- Primary pumps and leak detectors of the CFBs for each horizontal test benches to be installed on the floor instead of on the Passerelle/Plateforme,

- A new signal from the Horizontal Magnets has to be transmitted from TE-MSC to TE-CRG to indicate when electrical tests are ongoing on at least one test bench

- A PV has to be installed on each Vertical test bench to cut the HP Gaseous Helium supply (lock out)

- New signage (signalétique) to be installed close to each Helium exhaust (Safety Valve, Rupture Disk ...)

3. Central Area : B243/B353 (Purifiers area), Status concerning the Helium balloon and its repair

4. North Area : Planning for upgrade and consolidation concerning the new instrumentation for Helium gas management

5. CAST : disassembling of part of the equipment that can be used on other Cryoplants (e.g 2K-pumping system)

6. A.O.Bs / other proposals or needs ?