10:30
|
Present status of Point 4 Lay-Out and next steps.
-
João Oliveira
(CERN)
|
10:50
|
Status of the 2D Drawings of the Optics v.1.5 and v.1.6.
-
João Oliveira
(CERN)
|
11:10
|
POSTPONED FOR NEXT WEEK: UR baseline (2D drawings of equipment and excel equipment list).
-
João Oliveira
(CERN)
|
|