10:30
|
De-Installation/Installation: Revision of MCEW technical status and costing.
-
Pedro Pinheiro
(Universidade de Lisboa (PT))
|
10:50
|
Status of the Circuit Database.
-
Pedro Pinheiro
(Universidade de Lisboa (PT))
|
11:10
|
UR baseline (2D drawings of equipment and excel equipment list).
-
João Oliveira
(CERN)
|
11:30
|
Brain storming on the possible means to gain aperture at the level of the sector valve of Q4.
-
Riccardo De Maria
(CERN)
Paolo Fessia
(CERN)
Giuseppe Bregliozzi
(CERN)
|