Convener:
Alain Delbart
(Université Paris-Saclay (FR))
- news about the test beam at T10
- installation completed
- T2K gas at ~100l/h with H2O~-31°C (~400 ppm) and O2~90 ppm
- ERAMs @ nominal 350V on mockup & prototype ERAM-18
- DAQ stabilty issues. Workarounds were defined by Denis & Adrien. Still to be understood. A debriefing on DAQ should be organized after the test beam.
- Possibility of PS/T9 test beam (during ENUBET team test beam) the first 2 weeks of october
- may be an opportunity to test the ERAM-29 with the prototype if it is delivered and qualified in time
- very unlikely that we need to take more datas with the mockup
- the second week of this test beam will be the T2K collaboration meeting at CERN
- need to motivate the HA-TPC group after the huge effort on the T10 test beam
- to be discussed also regarding logistic/installation, gas availability, motivations (we need to plan the installation and commissioning of the ERAM-29 mounted on the prototype cage for cosmic runs at bdg 182)
- news about the ERAM test bench
- investigations on the leaks which prevents RH to be as low as in the past
- pressure test on the IN & OUT lines : no relevant leak detected
- planned to change IN/OUT connections on the chamber with swagelock connections and "black" metallic pipe instead of plastic
- ERAM-28 (glued by Cyrille last week) will be mounted tomorrow and scanned from sept 8 IF RH is low enough
- ERAM production
- ERAM-29 should be delivered this week (on-going cabling)
- DLC foils production is on-going so that mid october delivery is still expected mid october
- see minutes of ERAM test bench weekly meeting for detailed status
- TPC integration (WG1)
- Guillaume organized a meeting on sept 5 with F. Cadoux (UNIGE), Alain and Rémi to review the status of the TPC integration
- TPC fixation on basket interface brakets (produced by UNIGE and expected in 2 months) through plates fixed on TOP and Bottom corners of the TPC.
- Rémi is in close contact with fabrizio and Franck to gather the complete up to date 3D CAD model of the ND280 upgarde
- Rémi will check (with Fabrizio) the design of the TPC fixation plates. Once design validated, a Draftsman ("déssinateur projeteur") was affected by Fabrizio to produce the 2D production drawings of the plates
- production could be done in an external company (IRFU/DIS will place a call for order, may take some time) or these can be produced by INFN (probably Bari workshop ?). To be discussed with HA-TPC group
- there are still things to fix in the CAD drawings regarding global integration
- LV bus bar & powcon locations
- FEE cooling pipes path
- Location of the cathode HV connection which should be kept in the TPC allocated envelop to prevent any interfernce with TOF or SFGD
- up to now, SFGD cabling and heat dissipation is "asymetric" and the gap between theTOP TPC and the SFGD is larger than between SFGD and bottom TPC --> physics consequences ?
- Lifting of the TPC : the 4 top fixation plates will be equipped with hooks (Franck has a reference and supplier for them). Actual weight of equipped TPC still need to be evaluated.
- a lifting frame is also needed for SFGD and we should discuss with SFGD group on how to share this lifting frame at JPARC : this will be over specified for the TPCs and used with 2 different a hook positions, one for SFGD and one for TPC