GIM rehearsal
Wednesday 8/6/2022. RUN3 optics commissioning
Rehearsal of tomorrows GIM presentation, Andreas Wegscheider
Andreas showed the slides he prepared so far for his presentation on RUN3 optics commissioning in tomorrows group information meeting. The slides shown here are still in an early stage. The OMC team has been very active in beam commissioning of RUN3. The injection optics was found to be similar to last years beam test and no further correction needed. For the squeezed optics at top energy, measurements were performed between 60 and 30 cm. Corrections for squeezed optics are very important
(up to 150% beating without). Some RUN2 corrections would now be overcorrecting. Non-linear chromaticities were measured and found to be similar to RUN2. B6 corrections were tested for the first time.
OMC overview and Sextupole corrections, Ewen, slides
Ewen shows an overview of the 21 OMC shifts done during RUN3 commissioning. Most of these were scheduled over nights or holidays. Crossing angle scans were done. As expected from feed-down for sextupoles, a mostly quadratic change of tunes with crossing angle was found in the horizontal and vertical plane, with similar values for beam 1 and beam2. He also shows the tune changes with crossing angle after a3 and b3 corrections. The corrections are quite different from previous years.
B6 correction, Joschua, slides
Joschua shows a first, very preliminary detuning with amplitude analysis and compares with 2018 measurements, both for flat orbits and with crossing angles.
The calculated b6 corrections appear to fit well for beam2 and a bit less for beam1. Fitting with some very noisy points and realistic errors is challenging and will be further improved.
Global correction strategy, Tobias, slides
Tobias reminds that optics in RUN2 were very well corrected with residual beta beating of only few per cent.
Two K-modulation measurements were done this year and consistent beta values measured for both beams at IP1,5.
Tobias discusses different proposals for global corrections in RUN3. A first proposal is to stay constant with Q4 and Q5 corrections from 60 cm to 30 cm. This is the simpler option and expected should work well according to simulations. The second proposal is to use Q4, Q5 correction at 30 cm and trim these from ~ 80 cm and remeasure at 60 cm and correct without Q4,Q5.
In the discussion it was said that the main priority for corrections is the 30 cm optics, and that also 45 cm should be checked.
Felix and Rogelio comment on the phase advances between TCTs and extraction kicker that must remain within (30 deg) tolerances.